Cockfosters Depot & Edgware Depot: – Security Works

Project: Cockfosters Depot & Edgware Depot – Security Works Client: Tube Lines Limited Works Value: £16,000 As part of our Minor and Intermediate framework we were tasked with carrying out a few minor tasks at Cockfosters & Edgware Depots as part of the Access Control Works: Cockfosters Depot The card readers either side of the Depot […]

Moorgate Station: – Fire Stopping Works

Project: Moorgate – Fire Stopping Works Client: London Underground Limited – SWIP Works Value: £9,400   As an approved FIRAS accredited contractor, we were tasked with upgrading the fire stopping in the PPR Lift Area to provide 1 hour fire compartmentation. Existing damaged Supalux boards were removed and the voids behind were filled with Rockwool slabs. […]

Leicester Square Station: – Low Carbon Project

Project: Leicester Square Station – Low Carbon Project Client: Tube Lines Limited Works Value: £230,000 As part of the Low Carbon Project works at Leicester Square Station, various services i.e. ducting, hot & cold water feeds, cabling, conduit were installed through compartment walls.  Our task was to reinstate the compartment of each room altered by […]

Stratford Station: – Enabling Works – Escalators 1 & 2

Project: Stratford Station – Enabling Works – Escalators 1 & 2 Client: Tube Lines Limited Works Value: £80,000 D & D Rail were contracted with the enabling works associated with the replacement of Escalators 1 & 2 at Stratford Station. The enabling works consisted of the temporary removal and replacement of glass panels and metal barriers […]

Kingsbury Station: – Water Ingress Works

Project: Kingsbury Station – Water Ingress Works Client: Tube Lines Limited Works Value: £15,000 Existing Lift Lobbies to both Platforms 1&2 had issues with water ingress believed to be appearing from underside of structural slab.  Our task was to expose the structural slab below FFL and create new construction joints complete with water proof sealant […]

Heathrow T123 Station: – LUL

Project: Heathrow T123 Station – LUL Client: Tube Lines Limited Works Value: £750,000   D & D Rail Ltd completed the design & build project at Heathrow 123 LUL Station.  The SFA and Ambiance Project at Heathrow 123 LUL Station required a refit of the old British Transport Police accommodation.  This accommodation was to be […]

Dual Power Project: – Civil Works to Various Locations

Project: Dual Power Project – Civil Works to Various Locations Client: Tube Lines Limited Works Value: £70,000 This contract was for six Signalling Equipment Rooms (SERs) located at Kilburn, Willesden Green, Dollis Hill, Kingsbury, Queensbury & Canons Park Stations. These stations only had single power supplies fed to them, as part of the Jubilee Line Upgrade Works […]

Wembley Park Station: – Bridge MR32F Structure Refurbishment

Project: Wembley Park Station – Bridge MR32F Structure Refurbishment Client: Tube Lines Limited Works Value: £250,000 This contract is for the maintenance of an existing Train Crew Accommodation Bridge MR32F at Wembley Park Station, works were required to prepare delaminated areas of steelwork to ST3 Standard followed by a re-paint to the whole structure with […]

Highgate Depot Sidings: – Fencing Works

Project: Highgate Depot Sidings – Fencing Works Client: Tube Lines Limited Works Value: £40,000 At Highgate Depot Sidings we are on behalf of TLL installing approximately 130m of new 2.40m high chain link demarcation fence between Depot roads 8 & 9.  Work is being carried out at weekends during 8 – 10 hour Possessions. The works […]

Tottenham Hale Station: – Provision of Welfare, Secure Compound Area & Escalator Scaffold Access

Project: Tottenham Hale Station – Provision of Welfare, Secure Compound Area & Escalator Scaffold Access Client: London Underground Limited Works Value: £50,000 As part of the escalator upgrade works at Tottenham Hale Station, welfare and secure compound area was temporary installed (Complete with running water and drainage outlet) for site usage during the replacement of Escalator […]

West Kensington Station: – New Foundations

Project: West Kensington Station – New Foundations Client: Clancy Docwra Works Value: £23,000 As part of the task to provide Signal & Track Staff new accommodation, 36No new foundations were to be formed to accommodate modular units. Works included excavating trial holes for ground investigation / levelling waste ground / removal of redundant concrete pads / […]

Charing Cross Station: – Escalator 1 & 3 Replacement

Project: Charing Cross Station – Escalator 1 & 3 Replacement Client: London Underground Works Value: £73,000 Following on from the civil changes and the installation of new escalator frames and step chains etc. D&D Rail commenced the premises work which involved central staircase refurbishment, upper and lower circulation area tiling, re decorations within machine chambers and […]

Latest News

CONTRACT AWARD NEWS TfL Stratford Station Following on from recent works we carried out at this location we are pleased to announce that we have been successful with our bid for replacement tiling works at Stratford Station for TfL The works involve supply and installation of new tiling around the emergency stop posts for Escalators […]

Queen’s Park Station: – Route Enabling

Project: Queen’s Park Station – Route Enabling for Connect Contract at Stonebridge Park, Wembley Central to Stonebridge Park and Queen’s Park Stations Client: Tube Lines Limited Works Value: Overall £700,000 New hanger routes, new SDP base, antenna base, new concrete troughing and core drilling.  

Wembley Central Station: – Route Enabling

Project: Wembley Central Station – Route Enabling for Connect Contract at Stonebridge Park, Wembley Central to Stonebridge Park and Queen’s Park Stations   Client: Tube Lines Limited Works Value: Overall £700,000   New concrete troughing, antenna base, coupler bases and underpass cable routes.  

Touch to Call!