Hendon Central Station: – Step Free Access

Project: Hendon Central Station – Step Free Access Client: Tube Lines Limited Works Value: £950,000 As part of the Step Free Access programme D&D Rail Ltd was awarded the contract to install a lift shaft at Hendon Central. The position of the new lift shaft was to be positioned central within the island platform. Minimum […]

Bounds Green Station: – Modernisation & Enhancement Project

Project: Bounds Green Station – Modernisation & Enhancement Project Client: YJLi Works Value: £1 Million General station modernisation throughout whole of the station including the following works: Removal of floor and wall tiling. Repairs to walls, floors and general finishes including rendering. Stair repairs. Demolition. Core drilling. Replacement doors. New windows. Re-pointing existing brickwork.  

Acton Town Station: – Step Free Access & Modernisation Project

Project: Acton Town Station – Step Free Access & Modernisation Project Client: Tube Lines Limited Works Value: £1.2 Million Station modernisation works including strip-out of existing rooms, demolition and formation of new rooms including the new secure suite.  This included the following: Demolition and strip out of existing fixtures and fittings. Removal of floor finishes. […]

Hyde Park Station: – Modernisation

Project: Hyde Park Station – Modernisation Client: YJLi Works Value: £1.3 Million Replacement of platform surface (two platforms) including re alignment of platform nosings.  Complete strip and redecoration of trackside painted surface including hacking off and re-rendering substantial areas. Re-configuration of trackside tile band. Tiling on platforms and other public areas. Renewal of suspended ceiling […]