South Kensington – Escalator Replacement Civil Works

Project: South Kensington Escalator Replacement Civil Works Client: TfL Works Value: £690,000 Work on Piccadilly Line escalators at South Kensington Station.   PRE-ROM WORKS D&D Rail Ltd were contracted to carry out works in preparation for the removal & replacement of the 5no. existing escalators providing access to the Piccadilly Line at South Kensington Station […]

Marylebone Station – Escalator Replacement Civil & Premises Work (Phase 1)

Project: Marylebone Station Escalator Replacement Civil & Premises Work (Phase 1) Client: TfL Works Value: £815,000 The project is the replacement of Escalators 1 & 3 at Marylebone station, removing the staircase and replacing with an additional escalator (E2).  It is essential to keep the station running as normal whilst replacing the escalators within a […]

Canning Town Station – Redecoration Works

Project: Canning Town Station – Redecoration Works Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £7,500   Our task was to clean and paint various rooms requested by TFL.   We were requested to make good to the walls with minor filling and change the colour from magnolia walls to brilliant white which has now […]

Highgate Test Facility – Redecoration Works

Project: Highgate Test Facility – Redecoration Works Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £73,000   Our task was to clean and paint 7no. cabins at Highgate Test Facility.  All of these required external redecoration and 4no. also required redecoration to internal areas too with the intention to modernise the cabins and make […]

Golders Green Station – Redecoration Works

Project: Golders Green Station – Redecoration Works Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £26,000   Our task was to clean and paint station welfare rooms for the Train Operations Staff as instructed by TFL.  We were asked to paint various rooms and this has fully transformed these areas.  We were also tasked […]

Perivale Station: – Canopy Works

Project: Perivale Station – Canopy Works Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £35,000 Our task was to repair and replace any damage to the existing canopy façade caused by a vehicle hitting the canopy, repaint the station entrance and replace light fittings behind the signage with new LED lights. We were also […]

Shard Place: – Vent Shaft Works

Project: Shard Place – Vent Shaft Works Client: Mace Group Limited Works Value: £550,000 D&D Rail Ltd were appointed to be the specialist London Underground Contractor to undertake remodelling of the existing East Ventilation Shaft – Head House; aka Fielden House at London Bridge Station, in conjunction with London’s new building project Shard Place. The […]

Leigh Heath Court: – FIRAS Works

Project: Leigh Heath Court – FIRAS Works Client: Rylands Associates Works Value: £45,000 The scope of the works was to carry out internal decoration, overhaul and refurbishment of the communal areas of the building. This work included the removal and reconfiguration of the service riser cupboards and redundant lift shafts to avoid unauthorised access, improve […]

Tottenham Court Road Station: – Hoardings

Project: Tottenham Court Road – Hoardings Client: TfL Works Value: £45,000 Three one hour fire rated hoardings were installed to three different passages off the adjacent concourse to the new Cross Rail Station at Tottenham Court Road: D&D were also asked to remove these hoardings and replace them all in one shift to allow for […]

Paddington Station: – Machine Chamber Works

Project: Paddington – Machine Chamber Works Client: TfL Works Value: £47,300 Our task was to clean the Upper & Lower Machine Chambers walls & floors to a height of 1.8m for escalators 4 & 5 and paint handrails and staircase nosings including engineering steps under escalators 1 & 2. These works included scraping loose flaky paint […]

Northfields Depot: – Cab Access Platform

Project: Northfield Depot – Cab Access Platform Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £16,800 Our task was to install a Cab Access Platform between Roads 10 & 11 for Northfields Depot for ease of train drivers getting onto trains. We formed concrete bases for the Cab Access Platform to sit on. The […]

Edgware Road Station: – Wayfinding Map

Project: Edgware Road Station – Wayfinding Map Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £12,125 As part of the London Underground Station Ambience projects we was tasked with installing a new large Legible London wayfinding map in the Main Ticket Hall Passage. This is the first Legible London Map of this size to […]

Ash House: – Window & Door Replacements

Project: Ash House Window & Door Replacements Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £95,000   The existing windows and doors were in poor condition with some windows fixed shut where the opening mechanisms had been damaged and were deemed not suitable for repair.  Door hinges had broken and temporary hinges had been […]

St. Paul’s Station: – Machine Chamber Works

Project: St. Paul’s Station – Machine Chamber Works Client: LUL Works Value: £30,000 Our task was to clean the Upper & Lower Machine Chambers walls & floors to a height of 1.8m for escalators 4 & 5 and then subsequently paint handrails and staircase nosings, including treads & risers of the engineering steps, and clean out […]

Bank Station: – Tiling

Project: Tiling Works Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £140,000 Existing floor tiles and access hatches in the sloped passage to Waterloo & City Line needed to be replaced as the existing finishes life had expired. The benefits from this will be enhanced performance with the reduction of incidents of slips trips […]