Euston Station – Parcel Deck Accommodation – Premises Package

Project: Euston Station – Parcel Deck Accommodation Client: Tube Lines Limited Works Value: £20,000   These works were associated with the refurbishment of a suite of staff accommodation including male toilets/ showers, lobby, mess room and the creation of a new drying room. The following works were undertaken during this project: Male Toilet/ Showers: Works […]

Kilburn Station – Roof Works

Project: Kilburn Station – Roof Works Client: Tube Lines Limited Works Value: £70,000   The existing roof asset over the Station Entrance and Booking Hall located between the suspended track lines had a problematic water ingress issue.  Our task was to clean the existing roof covering of moss dirt and foliage, cut away damaged sections […]

Hammersmith Station – Congestion Relief – New Station Entrance

Project: Hammersmith Station – Congestion Relief – New Station Entrance Client: London Underground Limited – SWIP Team Works Value: £220,000   As part of the Congestion Relief Programme we carried out the Premises work for the new station entrance at Hammersmith (H & C Line) Station. Our works commenced with the removal and disposal of the […]

Brixton Station – Escalator 1 Steelwork Cleaning & Painting

Project: Brixton Station – Escalator 1 Steelwork Cleaning and Painting Client: London Underground Limited – L&E Team Works Value: £26,000   As part of LUL’s 3 Year Escalator Refurbishment plan, we carried out cleaning and painting of the Lower Machine Chamber (4/161) and Upper Machine Chamber (2/316) steelwork on Escalator 1 due to water damage. […]

Kings Cross Station & Walthamstow Station – UMC & LMC Cleaning and Painting

Project: Walthamstow Station & Kings Cross Station – UMC & LMC Cleaning and Painting Client: London Underground Limited – L&E Team Works Value: £56,000   We carried out cleaning and painting works at Walthamstow Central Station (Escalators 1&3) and Kings Cross Station (Escalators 7&9) in the Upper and Lower Machine Chambers as part of LUL’s […]

Brixton Station – UMC & LMC Cleaning & Painting

Project: Brixton Station – UMC & LMC Cleaning and Painting Client: London Underground Limited – L&E Team Works Value: £27,000   As part of London Underground Limited’s 3 Year Escalator Refurbishment Plan, we carried out cleaning and painting works within Escalators 1 & 3 Upper and Lower Machine Chambers at Brixton Station. We cleaned and […]

Arsenal Station – Subway Flooring

Project: Arsenal Station – Subway Flooring Client: Tube Lines Limited Works Value: £416,000   Our works to replace the non-compliant flooring at Arsenal Station were completed 9 weeks ahead of programme.  This was made possible by the close co-operation between JNP, D&D Rail Ltd, LUL Management and Station Staff.  With agreement from LUL Station Management, our […]

Arnos Grove Station – Brickwork

Project: Arnos Grove Station – Rebuilding Eastern Car Park East Side Wall Client: Tube Lines Limited Works Value: £65,000   The existing station Eastern car park East side wall, located between the station car park and the public house, was found to be in a dilapidated condition.  This wall had also sustained damage from trees which […]

Arnos Grove Sidings – Cab Access Platforms

Project: Arnos Grove Sidings – Cab Access Platforms Client: Tube Lines Limited Works Value: £80,000   Drivers at Arnos Grove were only able to access trains from one end of the Sidings.  Our scope of works was to install 5 No additional CAB Access Platforms at the Buffer Stop End of the Sidings to provide driver access […]

Benfleet Station – Steelwork Painting (ICATS)

Project: Benfleet Station – Cleaning Structural Support Steelwork Client: EWG Works Value: £3,000   The works included cleaning and rubbing down the surface of the existing Structural Support Steelwork  and application of a 2 part weatherproof painting system (EPIGRIP C402V2 Primer Coat & RESISTEX C137V2 Finish Coat) to ensure the integrity of the support steel steelwork is protected […]

Paddington Station – UMC & LMC Works

Project: Paddington Station – UMC & LMC Works Client: London Underground Limited – L&E Team Works Value: £25,000   We carried out cleaning and painting works within the Upper and Lower Machine Chambers at Paddington Station as part of London Underground Limited’s 3 Year Escalator Refurbishment Plan.  All existing assets had to be carefully protected for the duration […]

Canary Wharf Station – New Retail Units

Project: Canary Wharf Station – New Retail Units Client: London Underground Limited – SWIP Team Works Value: £160,000 We carried out demolition, building & premises works at Canary Wharf in preparation for the New Retail Units being set up at the Station. Our works commenced with the demolition of the male public toilets including removal of […]

Touch to Call!