Cockfosters Depot: – DDM Office Refurbishment

Project: Cockfosters Depot – DDM Office Refurbishment Works Client: Tube Lines Limited Works Value: £13,000   The DDM Office (1/803) required minor refurbishment under our framework for Minor & intermediate Works.  Works carried out included the following: The existing floor was a pre-1930, parquet floor and D&D was advised that this would be re-conditioned in the near […]

Oxford Circus: – Staircase Works

Project: Oxford Circus – Staircase Works Client: TLL-BCV Works Value: £205,000   Our task was to replace 332no. non-compliant treads over 7no. staircases on Levels 1, 5 & 6 of the Station with new compliant non-slip AATi pieces.  These works involved removal of existing nosings, repairs to existing substrate with Ardex products, drilling into existing substrate […]

Watford South Junction: – FIRAS Works

Project: Watford South Junction – FIRAS Works Client: Orion Engineering Works Value: £5,000 Two new rooms have been formed at Watford South Junction (SER & ESR).  Our client employed the services of DDR to maintain a minimum one hour fire compartment within these rooms where penetrative works to the building fabric had been carried out […]

Step Free Access: – Making the Tube Accessible for All

Project: Step Free Access – Step Free Access (31no. Locations) Client: LUL – SWIP Works Value: £150,000   As Transport for London (TfL) announced that nine out of ten buses are now accessible, London Underground (LU) also announced it is investing more than ever before to make the Tube as accessible as possible, as quickly as […]

North Harrow Junction: – FIRAS Works

Project: North Harrow Junction – FIRAS Works Client: SSE Works Value: £17,000   Two new rooms have been formed at North Harrow Junction (SER & ESR).  Our client employed the services of DDR to maintain a one hour fire compartment within these rooms, where penetrative works to the building fabric had been carried out by others.  […]

Perivale Station: – Roof & Ladder Works

Project: Perivale Station – Roof & Ladder Works Client: LUL – SWIP Works Value: £145,000   The asphalt roofs of Perivale Station were found to be in a poor state of repair.  On the upper roof and canopy the asphalt was found to be dilapidated.  On the upper roof this had caused  the vertical asphalt to […]

Moorgate Station: – PRM Lift

Project: Moorgate Station – PRM Lift Client: LUL – SWIP Works Value: £165,000   Our task was to install RMD Kwikform Superslim Soldier components in two forms to act as supporting and working platform systems.  The first form was to erect and prop the underside of 2/291 Mess Room floor slab external of the new lift […]

Waterloo Station: – Welfare Project Works

Project: Waterloo Station – Welfare Project Works Client: LUL – L&E Team Works Value: £17,000   Our task was to refurbish the redundant welfare area at Waterloo Station for the LUL Lift & Escalator Project Team.  These works included cleaning to doors, walls, floors and suspended ceilings throughout, replacing damaged sections of suspended ceilings where required, […]

Holborn Station: – Machine Chambers 1 to 3 – Cleaning & Decorating Works

Project: Holborn Station – Machine Chambers 1 to 3 – Cleaning & Decorating Works Client: LUL – L&E Team Works Value: £66,000   Following the refurbishment of the escalators by LUL we were given an order for comprehensive cleaning and repainting of the Machine Chambers. During the cleaning and painting works we protected LUL assets at […]

Stratford Market Depot: Security Works – Installation of New Air Conditioning Unit in Security Suite

Project: Stratford Market Depot Security Works Installation of New Air Conditioning Unit Client: Tube Lines Limited Works Value: £9,542   Due to change of use D&D Rail were instructed to install a new Air Conditioning Unit in a room in the Security Suite at Stratford Market Depot.  The scope was to install a unit to same […]

Canning Town Station: – Removal of Platform Supports

Project: Canning Town Station – Removal of Platform Supports Client: Tube Lines Limited Works Value: £10,500   There were 12 outriggers in total, 6 along each platform located some 14.5m apart.  Each was formed of a single spine beam with 10 side spur members and 22 tie bars. Due to the arrangement of the outriggers, access […]

Upminster Depot: – FIRAS Works

Project: Upminster Depot FIRAS Works Client: LUL SWIP Works Value: £110,000   There is a new building at Upminster Depot ‘Ancillary Building’ that was built by others.  The services of DDR were employed to install 5No new double glazed window units, strengthen existing apertures and install 9No new steel door sets (2No of these installed […]

Watford Station: – FIRAS Works

Project: Watford FIRAS Works Client: Orion Engineering for LU Fire Team Works Value: £13,600   There are two new rooms located at Watford Station (SER & ESR) that were built by others.  The LUL Fire Team employed the services of DDR to maintain a one hour fire compartment with passive fire protection works under our […]

Kilburn Station: – Roof Works

Project: Kilburn Station – Roofing Works Client: Tube Lines Limited Works Value: £70,000   The existing rendered walls to Upper & Lower Roof Areas required attention due to water ingress into the Station Entrance below.  As part of our framework for Minor & intermediate Works we were required to clean off the existing debris, scrape off […]

Manor House: – Drainage Works

Project: Manor House Station – Drainage Works Client: Tube Lines Limited Works Value: £7,000   As part of our framework for Minor & intermediate Works we were required to fabricate and replace the existing stair drainage channel gratings on Exits 1- 5 & 7.  This also included cleaning out all drainage channels and gratings on each […]

Touch to Call!