Mill Hill East Station: – Platform Replacement
Project: Mill Hill East Station – Platform Replacement Client: Tube Lines Limited Works Value: £150,000 Works at this station comprised of the replacement of the existing platform decking/ surfacing and defective structural timber members beneath the platform. In addition to this we are to remove the lead based paint from the lighting standard support steelwork. […]
Edgware Depot: – Kitchen
Project: Edgware Depot – Kitchen Client: Tube Lines Limited Works Value: £7,000 These works consisted of the supply and installation of a small kitchen in the Security Hut at the entrance to Edgware Depot. In addition to this we relocated and fixed an Armco Barrier around the perimeter of a new car parking area, broke […]
Whitechapel Station: – Roofing Works
Project: Whitechapel Station – Roofing Works Client: London Underground Limited Works Value: £75,000 As part of the works to install a new SER at Whitechapel Station there was a requirement to further waterproof the roof slab due to water ingress. The initial works were carried out during a 72 hour Possession with the remainder on […]
Wembley Park Station: – FIRAS Works
Project: Wembley Park Station FIRAS Works Client: SSE Value: £14,000 There are two new rooms located at Wembley Park Station (SER & ESR) that were built by others. The LUL Fire Team employed the services of DDR to bring the room up to a one hour fire compartment with passive fire protection works under […]
South Harrow Station: – REB Base
Project: South Harrow Station – REB Base Client: Tube Lines Limited Value: £18,000 As part of our framework for Minor & intermediate Works we were required to form a hard standing concrete base to accommodate an REB unit for the local signalling interface replacement works for APJNP. We were also required to use a crane […]
Neasden Depot: – FIRAS Works
Project: Neasden Depot – FIRAS Works Client: Orion Engineering on behalf of SSE Plc Works Value: £7,500 There are two new rooms located at Neasden Depot (SER & ESR) that were built by others. The LUL Fire Team produced a ‘Condition Report’ to bring the room up to a one hour fire compartment, and DDR […]
Kingsbury Station: – Re-bedding Tactiles
Project: Kingsbury Station – Re-bedding Tactiles Client: Tube Lines Limited Works Value: £72,000 The majority of the tactiles on Platforms 1 & 2 at Kingsbury Station were found to be loose and uneven. The joint between the tactiles and the platform nosings was also found to have fragmented over time. Our scope was to remove all of […]
Cockfosters Depot & Edgware Depot: – Security Works
Project: Cockfosters Depot & Edgware Depot – Security Works Client: Tube Lines Limited Works Value: £16,000 As part of our Minor and Intermediate framework we were tasked with carrying out a few minor tasks at Cockfosters & Edgware Depots as part of the Access Control Works: Cockfosters Depot The card readers either side of the Depot […]
Moorgate Station: – Fire Stopping Works
Project: Moorgate – Fire Stopping Works Client: London Underground Limited – SWIP Works Value: £9,400 As an approved FIRAS accredited contractor, we were tasked with upgrading the fire stopping in the PPR Lift Area to provide 1 hour fire compartmentation. Existing damaged Supalux boards were removed and the voids behind were filled with Rockwool slabs. […]
Russell Square Station: – Lifts 1-2-3 – Civil Enabling Works
Project: Russell Square Station – Lift 1, 2 & 3 – Civil Enabling Works Client: Tube Lines Limited Works Value: £70,000 As part of the Lift 1, 2 & 3 replacement works at Russell Square Station, our task was to carry the civil enabling works in conjunction with this. Works involved the following: Lift 1 […]
Boston Manor Station: – Walkways
Project: Boston Manor – Walkways Client: Tube Lines Limited Works Value: £29,000 This work consisted of modifications to the existing fence to incorporate a new access gate with S1 lock, construction of a new walkway for access purposes which was to be left in-situ once works had been completed, construction of a cable stile over […]
East Putney, Parsons Green & Wimbledon Park Stations: – Platform Works
Project: East Putney, Parsons Green & Wimbledon Park Stations – Platform Works Client: IPS Works Value: £100,000 Works consisted of excavation on the platforms and formation of new reinforced concrete lighting column bases complete with reinstatement of platform surfaces. New duct routes were also excavated and installed on the platforms for new services to […]
Bollo House: – Civils-Electrical-Fire Disciplines for Lift Replacement
Project: Bollo House – Civils, Electrical & Fire Disciplines for Lift Replacement Client: Tube Lines Limited Works Value: £40,000 The existing lift at Bollo House was built circa 1996. To enable this to meet DDA requirements, a new wider lift needed to be installed. Our task was to create wider and re-configured entrances at three levels […]
Bank Station: – Escalator 6 & 7 Cable Protection Premises & Civils Work
Project: Bank Station – Escalator 6 & 7 Cable Protection, Premises & Civils Work Client: London Underground Limited Works Value: £150,000 D&D Rail Ltd were contracted for the Cable Protection, Premises & Civils works associated with the replacement of Escalators 6 & 7 at Bank Station. Prior to the removal of the existing we were instructed […]