GRP Ballast Board: Installation to Bridges at Berkshire, Wiltshire and Birmingham
Project: Installation of GRP ballast Board to Bridges at Berkshire, Wiltshire and Birmingham Client: Osborne (for Network Rail) Works Value: £90,000 The sites had to be set up in mostly in remote locations and power had to run to these worksites with task lighting provided for large areas for night time possession working. Welfare […]
Highgate Service Control Centre: – Replacement of Vehicle Road Blocker
Project: Highgate Service Control Centre – Replacement of Vehicle Road Blocker Client: Tube Lines Limited Works Value: £25,000 The Vehicle Blocker on the access road to the Service Control Centre at Highgate was to be replaced due to safety concerns. D&D Rail were contracted to carry out the civils work associated with this activity. Works […]
Paddington Station: – Enabling Works – Streetworks
Project: Paddington Station – Enabling Works – Streetworks Client: UK Power Network Works Value: £12,000 We were awarded a contract for enabling works at Paddington Station. This work was related to the replacement of the existing DC supply escalators with new HD Metro type, supplied from a new AC intake to be installed by […]
Angel Station: – Welfare Facilities
Project: Angel Station – Welfare Facilities Client: London Underground Limited Works Value: £22,000 Our task was to provide the LUL L&E Projects Team with a welfare area constructed from a partition consisting of British Gypsum components which needed to maintain a one hour fire rated compartment during the project lifecycle. A Lobby, Welfare and Locker Room […]
Ruislip Depot: – Vehicle Load Gauges
Project: Ruislip Depot – Vehicle Load Gauges Client: Tube Lines Limited Works Value: £22,000 As part of our framework for Minor & intermediate Works we were asked to supply and install 2 No Vehicle Load Gauges over roads at Ruislip Depot. The gauges were to be installed on non-electrified track in areas of the depot […]
Bounds Green, Kentish Town & Old Street Stations: – Provision of Welfare Facilities
Project: Bounds Green, Kentish Town & Old Street Stations – Provision of Welfare Facilities Client: Tube Lines Limited Works Value: £170,000 D&D Rail Ltd were given an order to supply welfare facilities for the Tube Lines L&E Team whilst they were carrying out the refurbishment of escalators at Bounds Green, Kentish Town & Old Street […]
Westminster Station: – Replacement of Tactiles On Platforms 1 & 2
Project: Westminster Station – Replacement of Tactiles On Platforms 1 & 2 Client: Tube Lines Limited Works Value: £80,000 As part of our framework for Minor & intermediate Works we were asked to replace undersized concrete tactiles on platforms 1 & 2 of Westminster Station with full sized concrete tactiles. Our works commenced with the […]
Mornington Crescent Station: – Platforms 1&2 Hoarding Installation
Project: Mornington Crescent – Platforms 1 & 2 Hoarding Installation Client: Tube Lines Limited Works Value: £22,000 To support the re-rail and sleeper rehabilitation programme, our task was to install storage hoardings for the project. These were located at the tail wall end of Platform 1 (Northbound) and at the head wall end of Platform […]
Cockfosters Depot: – New Security Gate House Project – Civil Works
Project: Cockfosters Depot – New Security Gate House Project Client: Tube Lines Limited Works Value: £40,000 This work package is for the Enabling Works for the installation of a new Security Cabin at the Entrance to Cockfosters Depot. Our scope was for the construction of a concrete base to support the new cabin, the formation […]
Euston Station: – Airwave Dual Cab Sites Enabling (Civils)
Project: Euston Station – Airwave Dual Cab Sites Enabling (Civils) Client: Tube Lines Limited Works Value: £25,000 This work package was for the Civils Works as part of the Airwave Dual Cab Sites Enabling Project. The works were to provide support for the relocation of existing power cabinets and installation of new power cabinets at […]
Heathrow T123 Station: – SMEP Firestopping
Project: Heathrow T123 Station – SMEP Firestopping Client: Tube Lines Limited Works Value: £55,000 As a FIRAS approved contractor, we were instructed to carry out the permanent fire stopping and fire compartmentation for the Heathrow T123 SMEP Project. During the course of the SMEP project at this station several contractors were tasked with making […]
Morden Station: – New Stepping Back Office (Premises, Civils, Electrical and Fire)
Project: Morden Station- New Stepping Back Office (Premises, Civils, Electrical and Fire) Client: Tube Lines Limited Works Value: £125,000 We were awarded a work package for the formation of a new Stepping Back Office at Morden Station. This work package included Premises, Civils, Electrical and Fire scopes. The existing DMT’s Office was to have a […]
Stratford Market Depot: – Premises Works
Project: Stratford Market Depot – Premises Works Client: Tube Lines Limited Works Value: £90,000 D&D Rail Ltd have carried out several projects at Stratford Market Depot for TLL under the Minor Works Contract. These projects were carried out on behalf of the security team to improve Access Control. The following tasks were undertaken as […]
Night Tube: – Enabling Works – Collapsible Gate Project
Project: Night Tube – Enabling Works – Collapsible Gate Project Client: Tube Lines Limited Works Value: £60,000 We were required to manufacture and install bespoke portal frames for housing collapsible gates to aid station staff once the Night Tube went live at Canning Town, Liverpool Street, London Bridge & Piccadilly Circus Stations. The frames were […]
Ruislip Depot: – Pit Road Drainage
Project: Ruislip Depot – Pit Road Drainage Client: Tube Lines Limited Works Value: £5,000 We were requested to attend a site meeting at Ruislip Depot to help solve a problem with the drainage of 2 No. Pit Roads. The Depot ends of the Pit Roads had been bunded to retain contaminated water produced during […]