Greenford Station: – Phase I – Civil works in conjunction with installation of Escalator 1
Project: Greenford Station – Phase I – Civil Works in Conjunction with Installation of Escalator 1 Client: London Underground Limited – L&E Team Works Value: £230,000 Our task was to carry out the civil works in conjunction with new install of Escalator 1 at Greenford Station. These works involved the following: Temporary cable protection was […]
Hammersmith Service Control Centre: – Premises Works
Project: Hammersmith Service Control Centre – Premises Works Client: TfL Four Lines Modernisation Works Value: £30,000 Our scope of works included the provision of premises works including floor finishes and penetrations to install new floor vents and service grommets. Survey Of Existing Room Condition Prior to commencing any works D&D Rail had to undertake […]
Edgware Station: – Walkway
Project: Edgware Station – Walkway Client: Tube Lines Limited Works Value: £78,000 Our scope of works included the provision of a new walkway, door and associated lighting at Edgware Station between the train shed and the north end of platform 3 to allow train drivers more convenient and safer access to and from trains stabled […]
Kennington Station: – Replacement of Defective Delta Lining
Project: Kennington Station – Replacement of Defective Delta Lining Client: Tube Lines Limited Works Value: £170,000 We were tasked with the replacement of defective DELTA Lining on the Platform 4 walls. Works at high level were carried out off of mobile towers erected either onto the track bed or off of pit platforms. The […]
Various Stations: – Installation of New Fall Protection System
Project: Various Stations – Installation of New Fall Protection System Client: Tube Lines Limited Works Value: £219,000 This project was for removal of the existing Kee Klamp edge protection and installation of a new Fall Protection System at Alperton, Boston Manor, Bounds Green, Burnt Oak, Chalk Farm, Colliers Wood, South Wimbledon & South Harrow […]
Euston Station: – Parcel Deck Accommodation – Premises Package
Project: Euston Station – Parcel Deck Accommodation Client: Tube Lines Limited Works Value: £20,000 These works were associated with the refurbishment of a suite of staff accommodation including male toilets/ showers, lobby, mess room and the creation of a new drying room. The following works were undertaken during this project: Male Toilet/ Showers: Works […]
Kilburn Station: – Roof Works
Project: Kilburn Station – Roof Works Client: Tube Lines Limited Works Value: £70,000 The existing roof asset over the Station Entrance and Booking Hall located between the suspended track lines had a problematic water ingress issue. Our task was to clean the existing roof covering of moss dirt and foliage, cut away damaged sections […]
Hammersmith Station: – Congestion Relief – New Station Entrance
Project: Hammersmith Station – Congestion Relief – New Station Entrance Client: London Underground Limited – SWIP Team Works Value: £220,000 As part of the Congestion Relief Programme we carried out the Premises work for the new station entrance at Hammersmith (H & C Line) Station. Our works commenced with the removal and disposal of the […]
Brixton Station: – Escalator 1 Steelwork Cleaning & Painting
Project: Brixton Station – Escalator 1 Steelwork Cleaning and Painting Client: London Underground Limited – L&E Team Works Value: £26,000 As part of LUL’s 3 Year Escalator Refurbishment plan, we carried out cleaning and painting of the Lower Machine Chamber (4/161) and Upper Machine Chamber (2/316) steelwork on Escalator 1 due to water damage. […]
Kings Cross Station & Walthamstow Station: – UMC & LMC Cleaning and Painting
Project: Walthamstow Station & Kings Cross Station – UMC & LMC Cleaning and Painting Client: London Underground Limited – L&E Team Works Value: £56,000 We carried out cleaning and painting works at Walthamstow Central Station (Escalators 1&3) and Kings Cross Station (Escalators 7&9) in the Upper and Lower Machine Chambers as part of LUL’s […]
Brixton Station: – UMC & LMC Cleaning & Painting
Project: Brixton Station – UMC & LMC Cleaning and Painting Client: London Underground Limited – L&E Team Works Value: £27,000 As part of London Underground Limited’s 3 Year Escalator Refurbishment Plan, we carried out cleaning and painting works within Escalators 1 & 3 Upper and Lower Machine Chambers at Brixton Station. We cleaned and […]
Arnos Grove Station: – Brickwork
Project: Arnos Grove Station – Rebuilding Eastern Car Park East Side Wall Client: Tube Lines Limited Works Value: £65,000 The existing station Eastern car park East side wall, located between the station car park and the public house, was found to be in a dilapidated condition. This wall had also sustained damage from trees which […]
Arnos Grove Sidings: – Cab Access Platforms
Project: Arnos Grove Sidings – Cab Access Platforms Client: Tube Lines Limited Works Value: £80,000 Drivers at Arnos Grove were only able to access trains from one end of the Sidings. Our scope of works was to install 5 No additional CAB Access Platforms at the Buffer Stop End of the Sidings to provide driver access […]
Benfleet Station: – Steelwork Painting (ICATS)
Project: Benfleet Station – Cleaning Structural Support Steelwork Client: EWG Works Value: £3,000 The works included cleaning and rubbing down the surface of the existing Structural Support Steelwork and application of a 2 part weatherproof painting system (EPIGRIP C402V2 Primer Coat & RESISTEX C137V2 Finish Coat) to ensure the integrity of the support steel steelwork is protected […]
Paddington Station: – UMC & LMC Works
Project: Paddington Station – UMC & LMC Works Client: London Underground Limited – L&E Team Works Value: £25,000 We carried out cleaning and painting works within the Upper and Lower Machine Chambers at Paddington Station as part of London Underground Limited’s 3 Year Escalator Refurbishment Plan. All existing assets had to be carefully protected for the duration […]