Canary Wharf Station: – New Retail Units
Project: Canary Wharf Station – New Retail Units Client: London Underground Limited – SWIP Team Works Value: £160,000 We carried out demolition, building & premises works at Canary Wharf in preparation for the New Retail Units being set up at the Station. Our works commenced with the demolition of the male public toilets including removal of […]
Leicester Square Station: – Low Carbon Project
Project: Leicester Square Station – Low Carbon Project Client: Tube Lines Limited Works Value: £230,000 As part of the Low Carbon Project works at Leicester Square Station, various services i.e. ducting, hot & cold water feeds, cabling, conduit were installed through compartment walls. Our task was to reinstate the compartment of each room altered by […]
Stratford Station: – Enabling Works – Escalators 1 & 2
Project: Stratford Station – Enabling Works – Escalators 1 & 2 Client: Tube Lines Limited Works Value: £80,000 D & D Rail were contracted with the enabling works associated with the replacement of Escalators 1 & 2 at Stratford Station. The enabling works consisted of the temporary removal and replacement of glass panels and metal barriers […]
Kingsbury Station: – Water Ingress Works
Project: Kingsbury Station – Water Ingress Works Client: Tube Lines Limited Works Value: £15,000 Existing Lift Lobbies to both Platforms 1&2 had issues with water ingress believed to be appearing from underside of structural slab. Our task was to expose the structural slab below FFL and create new construction joints complete with water proof sealant […]
Dual Power Project: – Civil Works to Various Locations
Project: Dual Power Project – Civil Works to Various Locations Client: Tube Lines Limited Works Value: £70,000 This contract was for six Signalling Equipment Rooms (SERs) located at Kilburn, Willesden Green, Dollis Hill, Kingsbury, Queensbury & Canons Park Stations. These stations only had single power supplies fed to them, as part of the Jubilee Line Upgrade Works […]
Wembley Park Station: – Bridge MR32F Structure Refurbishment
Project: Wembley Park Station – Bridge MR32F Structure Refurbishment Client: Tube Lines Limited Works Value: £250,000 This contract is for the maintenance of an existing Train Crew Accommodation Bridge MR32F at Wembley Park Station, works were required to prepare delaminated areas of steelwork to ST3 Standard followed by a re-paint to the whole structure with […]
Highgate Depot Sidings: – Fencing Works
Project: Highgate Depot Sidings – Fencing Works Client: Tube Lines Limited Works Value: £40,000 At Highgate Depot Sidings we are on behalf of TLL installing approximately 130m of new 2.40m high chain link demarcation fence between Depot roads 8 & 9. Work is being carried out at weekends during 8 – 10 hour Possessions. The works […]
Tottenham Hale Station: – Provision of Welfare, Secure Compound Area & Escalator Scaffold Access
Project: Tottenham Hale Station – Provision of Welfare, Secure Compound Area & Escalator Scaffold Access Client: London Underground Limited Works Value: £50,000 As part of the escalator upgrade works at Tottenham Hale Station, welfare and secure compound area was temporary installed (Complete with running water and drainage outlet) for site usage during the replacement of Escalator […]
West Kensington Station: – New Foundations
Project: West Kensington Station – New Foundations Client: Clancy Docwra Works Value: £23,000 As part of the task to provide Signal & Track Staff new accommodation, 36No new foundations were to be formed to accommodate modular units. Works included excavating trial holes for ground investigation / levelling waste ground / removal of redundant concrete pads / […]
Charing Cross Station: – Escalator 1 & 3 Replacement
Project: Charing Cross Station – Escalator 1 & 3 Replacement Client: London Underground Works Value: £73,000 Following on from the civil changes and the installation of new escalator frames and step chains etc. D&D Rail commenced the premises work which involved central staircase refurbishment, upper and lower circulation area tiling, re decorations within machine chambers and […]
Warren Street Station: – Compound Removal
Project: Warren Street Station – Compound Removal Client: London Underground Limited – Nominee BCV Limited Works Value: £25,000 D & D Rail were asked to assist with the removal of the LUL Site Compound located outside of Warren Street LUL Station. We were initially asked to price to cut the cabins down into manageable sections. […]
Golders Green Station: – Platform Strengthening Project
Project: Golders Green Station – Platform Strengthening Project Client: YJLi Works Value: £50,000 Platform strengthening works comprising of additional supports being installed underneath the disused platform so that this could be used to take the required passenger loadings and become a ‘live’ platform. The supports comprised of steel beams, props and harjacks with the best […]
Waterloo International Station: – Terminal Conversion Link Project
Project: Waterloo International Station – Terminal Conversion Link Project Client: YJLi Works Value: £134,000 This project was to re-open Platform 20 of Waterloo station for the use of “domestic” services with access / egress via platform 19. This was achieved by forming two openings through the dividing wall between Platforms 19 and 20. One opening nearest the […]
Earl’s Court Station: – Lifts 3 & 4 – Civils Work
Project: Earl’s Court Station – Lifts 3 & 4 – Civils Work Client: London Underground Limited – Capital Programmes Directorate Works Value: £58,000 The existing steelwork within the Counterweight Shaft required refurbishment as contained surface corrosion. The Counterweight Shaft is designated as a confined space. Using trained staff and working in accordance with a […]
Green Park Station: – Reinstallation of VE Panels
Project: Green Park Station – Reinstallation of VE Panels Client: Tube Lines Limited Works Value: £65,000 D & D Rail Ltd where recently instructed to reinstall 344 No VE Panels at Green Park Station. These VE Panels had been removed during station modernisation works carried out on the Victoria Line platforms and Lower Concourse by […]