Hanger Lane Station: – CMS works

Project: Hanger Lane Station – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   Project: Fluor Connect Enabling Works – New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases. The areas when these were installed were cleared of vegetation etc. and excavated. Type […]

C01: – Civils Package Works

Project: C01 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s. Enabling works for the CO1 ring. This work includes […]

Holborn Station: – CMS installation

Project: Holborn Station – Fluor Connect Enabling Works Client: Flour Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable containment installation within existing vent shaft as […]

M032, M034 & M036: – Fluor Connect Enabling Works

Project: MO32, MO34 & MO36 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable post installation for new trackside cabling […]

Redbridge Station: – Removal of Existing HVAC & Replacing with New System

Project: Redbridge Station – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Removal of existing HVAC and replacing with new system. Installing […]

Touch to Call!