Kennington Station: – NLE Civil, Premises, Mechanical & Electrical Works

Project: Kennington Station – NLE Civil, Premises, Mechanical & Electrical Works Client: FLO Works Value: £1,500,000 D&D Rail Ltd carried out RIBA 5 design and build fit out package at Kennington stations new cross passages. The works included screeding, paving, windpost support steel, blockwork, rendering, tiling, suspended ceilings, CCTV, PAVA, CMS & lighting. The new […]

Greenford Station: – Phase II & III – L&E Civils Works

Project: Greenford Station – Phase II & III – Civil Works in Conjunction with Installation of New Inclined Lift and the Replacement of Existing Central Staircase Client: London Underground Limited – L&E Team Works Value: £1.4 Million As part of the installation of new Inclined Lift & Central Staircase at Greenford Station, our task was to […]

Waterloo Eurostar: – Peak Hour Subway Conversion Project

Project: Waterloo Eurostar – Peak Hour Subway Conversion Project Client: YJLi Works Value: £2.04 Million This project was driven by Network Rails desire to ease passenger flows from their main line terminus at Waterloo in to the LUL network.  This was to be achieved by introducing three new link stairways and three new gate lines. […]

Bounds Green Station: – Modernisation & Enhancement Project

Project: Bounds Green Station – Modernisation & Enhancement Project Client: YJLi Works Value: £1 Million General station modernisation throughout whole of the station including the following works: Removal of floor and wall tiling. Repairs to walls, floors and general finishes including rendering. Stair repairs. Demolition. Core drilling. Replacement doors. New windows. Re-pointing existing brickwork.  

Acton Town Station: – Step Free Access & Modernisation Project

Project: Acton Town Station – Step Free Access & Modernisation Project Client: Tube Lines Limited Works Value: £1.2 Million Station modernisation works including strip-out of existing rooms, demolition and formation of new rooms including the new secure suite.  This included the following: Demolition and strip out of existing fixtures and fittings. Removal of floor finishes. […]

Hyde Park Station: – Modernisation

Project: Hyde Park Station – Modernisation Client: YJLi Works Value: £1.3 Million Replacement of platform surface (two platforms) including re alignment of platform nosings.  Complete strip and redecoration of trackside painted surface including hacking off and re-rendering substantial areas. Re-configuration of trackside tile band. Tiling on platforms and other public areas. Renewal of suspended ceiling […]

South Wimbledon Station: – Modernisation

Project: South Wimbledon Station – Modernisation Client: YJLi Works Value: £1.37 Million   Replacing individual and groups of tiling, matching into existing, to public and non-public areas including ticket office, platforms and trackside. Ceramic and V.E. tiling replaced. Renewed flooring in ticket office Plaster repairs to walls and ticket office ceiling. Overhauling skylight, replacing glazing […]

Covent Garden Station: – Congestion Relief

Project: Covent Garden Station – Congestion Relief Client: Tube Lines Limited Works Value: £1.4 Million   The purpose of the works was primarily the creation of additional space that was previously utilised as a Bureau De Change at ground floor level to allow for installation of additional exit gates. The existing Ticket Office remained with […]

Finchley Road Station: – Modernisation & Enhancement Project

Project: Finchley Road Station – Modernisation & Enhancement Project Client: Tube Lines Limited Value: £1.8 Million   Station modernisation works including strip-out of existing rooms, demolition and formation of new rooms including the new secure suite. This included the following: Demolition and strip out of existing fixtures and fittings Removal of floor finishes Removal and replacement […]

Jubilee Line Extension: – New Ticket Office

Project: Jubliee Line Extension – New Ticket Office Client: Lovell Construction Limited Works Value: £2.5 Million   The Jubilee Line Extension required new Ticket Offices to be installed at all stations from Westminster through to Stratford this was a design and build project working from the original JLE concept drawing. The ticket offices were taken through […]

South Ealing Station: – Post Route & SDP Installation

Project: South Ealing Station – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot Client: Tube Lines Limited Value: Overall £4 Million   New trackside cable containment, New SDP base and antenna base were constructed. The areas when these were installed were cleared of vegetation etc. and excavated. Type 2 […]

Northfields Depot: – SDP & Troughing Installation

Project: Northfields Depot – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot Client: Tube Lines Limited Value: Overall £4 Million   The new SDP base was constructed adjacent to the Depot access road.  A new cable riser and draw pit were incorporated in the pour along with existing cable […]

Boston Manor Station: – Installation of New SDP Base

Project: Boston Manor Station – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot Client: Tube Lines Limited Works Value: Overall £4 Million   New trackside cable containment, new trackside equipment bases and formation/upgrade of new rooms within station environments. Please see below for selection works. Works at Boston Manor […]

Earl’s Court Station: – Modernisation

Project: Earl’s Court Station – Modernisation Client: Metronet SSL Works Value: £4.1 Million   Major building works in association with the modernisation of Earls Court Station including but not exclusively: The demolition of existing South side accommodation and the reconstruction of new ticket offices and service accommodation including the provision of new concrete slabs over the […]

Touch to Call!