Stepney Green Station: – Walkway

Project: Stepney Green Walkway 1/201 Installation of Elevated Slab & Works to Staircase 1/604 Client: TfL SWIP ASPIRE Works Value: £350,000   D&D Rail were instructed to undertake works to construct a new walkway slab 1/201 within Stepney Green station.  The existing slab currently forms the ceiling of various equipment rooms within the station. Our works […]

Bond Street Station: – ISOR Steelwork and Premises Package

Project: Bond Street Station – ISOR Steelwork and Premises Package Client: Tube Lines Limited – SWIP Team Works Value: £400,000 The existing SOR (Station Operations Room) was due to be refurbished so the staff operating the Station needed to be temporarily housed during this time.  Our task was to build an ISOR (Interim Station Operations Room) […]

Northfields Depot: – Refurbishment of the Duty Depot Manager’s Office & Construction of a new Mezzanine Area

Project: Northfields Depot – Refurbishment of the Duty Depot Managers Office & Construction of a New Mezzanine Area Client: Tube Lines Limited Works Value: £425,000   Our works for Northfields Depot were completed as part of our Minor and Intermediate Framework with Tube Lines.  This project was for the refurbishment of the Duty Depot Manager’s […]

Kings Cross Station: – Escalators 1, 2, 3 Civil & Premises Works

Project: Kings Cross Station – Escalators 1, 2, 3 Civil & Premises Works Client: London Underground Limited – L&E Team Works Value: £428,000   As part of the of Escalators 1-3 replacement works at King’s Cross Station our task was to carry out the Civil & Premises works in conjunction with new install.  Works included the […]

Arsenal Station: – Subway Flooring

Project: Arsenal Station – Subway Flooring Client: Tube Lines Limited Works Value: £416,000   Our works to replace the non-compliant flooring at Arsenal Station were completed 9 weeks ahead of programme.  This was made possible by the close co-operation between JNP, D&D Rail Ltd, LUL Management and Station Staff.  With agreement from LUL Station Management, our […]

Walthamstow Central Station: – New Build Sub Station

Project: Walthamstow Central Station – New Build Sub Station Client: Birse Metro Limited Works Value: £265,000 Walthamstow Central was undergoing Step Free Access alteration and new lifts shafts had been installed on site by the main contractor. D&D Rail Ltd were awarded the contract to build a new single story sub-station to power the lifts. […]

Stanmore Station: – Modernisation & Enhancement Project

Project: Stanmore Station – Modernisation & Enhancement Project Client: Tube Lines Limited Works Value: £275,000 D&D Rail Ltd were awarded the contract at Stanmore Station for the refurbishment of the platform canopy. The works consisted of complete removal of all existing paint coating from the canopy and supporting steelwork. The platforms, surrounding assets and cabling […]

Euston Square Station: – Refurbishment

Project: Euston Square Station – Refurbishment Client: Metronet SSL Works Value: £350,000 General refurbishment of and change over of rooms for ‘Connect Contract’. Steel frame installation: Steel frames were installed to take the weight of the subway above. Existing walls were removed and a full CDS drawn up to support the above subway. New door […]

Belsize Park Station: – Modernisation & Enhancement Projects

Project: Belsize Park Station – Modernisation & Enhancement Projects Client: YJLi Works Value: £350,000 Belsize Park Station underwent a modernisation & enhancement programme. D&D Rail Ltd carried out repair work to all areas of the station, The work was carried out during Engineering hours working times. Existing wall and floor tiles were removed from all […]

Aldwych Station: – Refurbishment

Project: Aldwych Station – Refurbishment Client: Tube Lines Limited Works Value: £350,000 Works included general refurbishment of disused station, currently being utilised by London Underground as a station for marketing purposes (film sets, exhibitions, army and police training). Works comprised of upgrading various rooms to LUL Section 12; renewal of doors; removal of various trial areas […]

Totteridge & Whetstone Station: – Modernisation & Enhancement

Project: Totteridge & Whetstone Station – Modernisation & Enhancement Client: Fitzpatrick Contractors Limited Works Value: £400,000 Totteridge & Whetstone Station underwent a modernisation & enhancement programme. D&D Rail Ltd carried out repair work to all areas of the station, this included repairs and modernisation to the existing main building, repairs and modernisation to platform buildings […]

RVAR Surveys – Various Locations

Project: RVAR Surveys – Various Locations Client: London Underground Works Value: £300,000   D&D Rail have carried out a large number of surveys for the RVAR project for London Underground. These surveys were carried out to assess the feasibility of raising an area of the platform to the level of the train carriage. Our surveys were […]

Aldgate Station: – Facilities Package

Project: Aldgate Station – Facilities Package Client: London Underground Limited – Nominee SSL Works Value: £325,000   Take tenancy within offices located next to Station property.  Use space to partition and create individual areas for each contractor including a meeting room and welfare area. Provide a portacabin for client office set up. Installation of telephone […]

Archway Station: – Construction of new signalling equipment room

Project: Archway Station – Construction of New Signalling Equipment Room Client: Tube Lines Limited Works Value: £280,000   Construction of a new SER in a vent shaft at Archway Station. The new SER was to be built 2 metres above the existing CER, supported on a steel framework fixed to the tunnel ring/shaft bolts. The new […]

Touch to Call!