Theydon Bois Station: – Replacement of 2 Platform Surfaces

Project: Theydon Bois Station – Connect BCV – Various Enabling Packages on Theydon Bois Station, Leytonstone Station and White City Depot Client: Birse Metro Limited – On Behalf of Metronet BCV Works Value: Overall £5.4 Million   Replacement of platform surface (two platforms) including re alignment of platform nosings. Complete strip and redecorate of trackside […]

White City Depot: – Constucting Reinforced Concrete Slabs

Project: White City Depot – Connect BCV – Various Enabling Packages on Theydon Bois Station, Leytonstone Station and White City Depot Client: Birse Metro Limited – On Behalf of Metronet BCV Works Value: Overall £5.4 Million   We have worked at two locations within the Depot constructing reinforced concrete slabs. The work involved over site […]

Leytonstone Station: – Connect BCV

Project: Leytonstone Station – Connect BCV – Various Enabling Packages on Theydon Bois Station, Leytonstone Station and White City Depot Client: Birse Metro Limited – On Behalf of Metronet BCV Works Value: Overall £5.4 Million   Within a very restricted site bordered by service cables and with the requirement to maintain access through the site […]

Touch to Call!