Stratford Station: – Plunger Works
Project: Stratford Station – Plunger Works Client: Tube Lines Limited Works Value: £72,000 Our task was to install new asset posts, one per platform on Platforms 13, 14 & 15 to enable existing plunger relocation by others, to improve access for Train Operations during train arrival/departure process. As the new posts were being installed along the […]
North Acton Station: – Ambience Works
Project: North Acton Station – Ambience Works Client: Tube Lines Limited – BCV/SSL Minor Works Works Value: £8,500 As part of the Ambience Package, D&D Rail were required to redecorate the waiting room 2/436 on platform 1 at North Acton Station. We completed the works during engineering hours and the works consisted of stripping the paint […]
Paddington Station: – Staircase Works
Project: Paddington Station – Staircase Works Client: Tube Lines Limited – BCV Minor Works Works Value: £45,200 Our task was to lay new ceramic corduroy tactiles at the top & bottom of 6No Staircases (1/604, 2/602, 2/603, 2/604, 2/605, 2/606 & 2/608), and bottom only of 1No Staircase (1/602) to bring these up to standard of […]
Leicester Square: – Central Kiosk Redecoration
Project: Leicester Square – Central Kiosk Redecoration Client: Tube Lines Limited – BCV Minor Works Works Value: £3,800 The Centre Kiosk area was originally empty and used for a floral display when the station first opened. The circular central glass area was built later and used as a display unit before becoming a control room. […]
Victoria Coach Station: – Roof Canopy Works
Project: Victoria Coach Station – Roof Canopy Works Client: LUL – SWIP Works Value: £134,000 Our works at Victoria Coach Station were part of the refurbishment of the roof canopy over the Main Departure Terminal. The scope included the refurbishment of the steel structure and the replacement of the glazing on the roof canopy. […]
Cockfosters Depot: – DDM Office Refurbishment
Project: Cockfosters Depot – DDM Office Refurbishment Works Client: Tube Lines Limited Works Value: £13,000 The DDM Office (1/803) required minor refurbishment under our framework for Minor & intermediate Works. Works carried out included the following: The existing floor was a pre-1930, parquet floor and D&D was advised that this would be re-conditioned in the near […]
Oxford Circus: – Staircase Works
Project: Oxford Circus – Staircase Works Client: TLL-BCV Works Value: £205,000 Our task was to replace 332no. non-compliant treads over 7no. staircases on Levels 1, 5 & 6 of the Station with new compliant non-slip AATi pieces. These works involved removal of existing nosings, repairs to existing substrate with Ardex products, drilling into existing substrate […]
Watford South Junction: – FIRAS Works
Project: Watford South Junction – FIRAS Works Client: Orion Engineering Works Value: £5,000 Two new rooms have been formed at Watford South Junction (SER & ESR). Our client employed the services of DDR to maintain a minimum one hour fire compartment within these rooms where penetrative works to the building fabric had been carried out […]
Step Free Access: – Making the Tube Accessible for All
Project: Step Free Access – Step Free Access (31no. Locations) Client: LUL – SWIP Works Value: £150,000 As Transport for London (TfL) announced that nine out of ten buses are now accessible, London Underground (LU) also announced it is investing more than ever before to make the Tube as accessible as possible, as quickly as […]
North Harrow Junction: – FIRAS Works
Project: North Harrow Junction – FIRAS Works Client: SSE Works Value: £17,000 Two new rooms have been formed at North Harrow Junction (SER & ESR). Our client employed the services of DDR to maintain a one hour fire compartment within these rooms, where penetrative works to the building fabric had been carried out by others. […]
Perivale Station: – Roof & Ladder Works
Project: Perivale Station – Roof & Ladder Works Client: LUL – SWIP Works Value: £145,000 The asphalt roofs of Perivale Station were found to be in a poor state of repair. On the upper roof and canopy the asphalt was found to be dilapidated. On the upper roof this had caused the vertical asphalt to […]
Moorgate Station: – PRM Lift
Project: Moorgate Station – PRM Lift Client: LUL – SWIP Works Value: £165,000 Our task was to install RMD Kwikform Superslim Soldier components in two forms to act as supporting and working platform systems. The first form was to erect and prop the underside of 2/291 Mess Room floor slab external of the new lift […]
Waterloo Station: – Welfare Project Works
Project: Waterloo Station – Welfare Project Works Client: LUL – L&E Team Works Value: £17,000 Our task was to refurbish the redundant welfare area at Waterloo Station for the LUL Lift & Escalator Project Team. These works included cleaning to doors, walls, floors and suspended ceilings throughout, replacing damaged sections of suspended ceilings where required, […]
Holborn Station: – Machine Chambers 1 to 3 – Cleaning & Decorating Works
Project: Holborn Station – Machine Chambers 1 to 3 – Cleaning & Decorating Works Client: LUL – L&E Team Works Value: £66,000 Following the refurbishment of the escalators by LUL we were given an order for comprehensive cleaning and repainting of the Machine Chambers. During the cleaning and painting works we protected LUL assets at […]
Stratford Market Depot: Security Works – Installation of New Air Conditioning Unit in Security Suite
Project: Stratford Market Depot Security Works Installation of New Air Conditioning Unit Client: Tube Lines Limited Works Value: £9,542 Due to change of use D&D Rail were instructed to install a new Air Conditioning Unit in a room in the Security Suite at Stratford Market Depot. The scope was to install a unit to same […]