Belsize Park Station: – Modernisation & Enhancement Projects

Project: Belsize Park Station – Modernisation & Enhancement Projects

Client: YJLi

Works Value: £350,000

Belsize Park Station underwent a modernisation & enhancement programme. D&D Rail Ltd carried out repair work to all areas of the station, The work was carried out during Engineering hours working times.

Existing wall and floor tiles were removed from all areas of the station. The walls and floors were repaired rendered and screed laid ready to accept new tiling. New tiling was installed to match existing heritage tiling. Replacement fire doors and frames were installed throughout the station. The platforms were rebated along their lengths behind the nosing stones and new ceramic tactile paving was installed. This was laid in stages during engineering hours along the platforms over a period of several nights. The staircases were prepared and replacement AATI stair nosing’s were installed along with new tread finishes

Extensive brickwork repairs and re-pointing was carried out to all areas of the station main building.

Following on from all modernisation and enhancement work the whole station underwent a deep cleaning process prior to hand over to LU along with all relevant health and safety files and documentation.

 

Touch to Call!