£0-£250K

21 Moorfields – Civil Works

Project: Civil Works Client: Mace Group Limited Works Value: £170,000   As part of the works at 21 Moorfields, ground bearing piles were installed to support a new structure to be built above Moorgate Station.  D&D Rail were tasked with casting concrete slabs at the base of these piles, down at platform level. All areas […]

0 comments

Angel Station – Welfare Facilities

Project: Angel Station – Welfare Facilities Client: London Underground Limited Works Value: £22,000 Our task was to provide the LUL L&E Projects Team with a welfare area constructed from a partition consisting of British Gypsum components which needed to maintain a one hour fire rated compartment during the project lifecycle.  A Lobby, Welfare and Locker Room […]

0 comments

Arnos Grove Sidings – Cab Access Platforms

Project: Arnos Grove Sidings – Cab Access Platforms Client: Tube Lines Limited Works Value: £80,000   Drivers at Arnos Grove were only able to access trains from one end of the Sidings.  Our scope of works was to install 5 No additional CAB Access Platforms at the Buffer Stop End of the Sidings to provide driver access […]

0 comments

Arnos Grove Station – Brickwork

Project: Arnos Grove Station – Rebuilding Eastern Car Park East Side Wall Client: Tube Lines Limited Works Value: £65,000   The existing station Eastern car park East side wall, located between the station car park and the public house, was found to be in a dilapidated condition.  This wall had also sustained damage from trees which […]

0 comments

Bank Station – Escalator 6 & 7 Cable Protection Premises & Civils Work

Project: Bank Station – Escalator 6 & 7 Cable Protection, Premises & Civils Work Client: London Underground Limited Works Value: £150,000 D&D Rail Ltd were contracted for the Cable Protection, Premises & Civils works associated with the replacement of Escalators 6 & 7 at Bank Station. Prior to the removal of the existing we were instructed […]

0 comments

Bank Station – Tiling

Project: Tiling Works Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £140,000 Existing floor tiles and access hatches in the sloped passage to Waterloo & City Line needed to be replaced as the existing finishes life had expired. The benefits from this will be enhanced performance with the reduction of incidents of slips trips […]

0 comments

Benfleet Station – Steelwork Painting (ICATS)

Project: Benfleet Station – Cleaning Structural Support Steelwork Client: EWG Works Value: £3,000   The works included cleaning and rubbing down the surface of the existing Structural Support Steelwork  and application of a 2 part weatherproof painting system (EPIGRIP C402V2 Primer Coat & RESISTEX C137V2 Finish Coat) to ensure the integrity of the support steel steelwork is protected […]

0 comments

Bollo House – Civils-Electrical-Fire Disciplines for Lift Replacement

Project: Bollo House – Civils, Electrical & Fire Disciplines for Lift Replacement Client: Tube Lines Limited Works Value: £40,000 The existing lift at Bollo House was built circa 1996.  To enable this to meet DDA requirements, a new wider lift needed to be installed. Our task was to create wider and re-configured entrances at three levels […]

0 comments

Boston Manor Station – Walkways

Project: Boston Manor – Walkways Client: Tube Lines Limited Works Value: £29,000   This work consisted of modifications to the existing fence to incorporate a new access gate with S1 lock, construction of a new walkway for access purposes which was to be left in-situ once works had been completed, construction of a cable stile over […]

0 comments

Bounds Green, Kentish Town & Old Street Stations – Provision of Welfare Facilities

Project: Bounds Green, Kentish Town & Old Street Stations – Provision of Welfare Facilities Client: Tube Lines Limited Works Value: £170,000   D&D Rail Ltd were given an order to supply welfare facilities for the Tube Lines L&E Team whilst they were carrying out the refurbishment of escalators at Bounds Green, Kentish Town & Old Street […]

0 comments

Brixton Station – Escalator 1 Steelwork Cleaning & Painting

Project: Brixton Station – Escalator 1 Steelwork Cleaning and Painting Client: London Underground Limited – L&E Team Works Value: £26,000   As part of LUL’s 3 Year Escalator Refurbishment plan, we carried out cleaning and painting of the Lower Machine Chamber (4/161) and Upper Machine Chamber (2/316) steelwork on Escalator 1 due to water damage. […]

0 comments

Brixton Station – UMC & LMC Cleaning & Painting

Project: Brixton Station – UMC & LMC Cleaning and Painting Client: London Underground Limited – L&E Team Works Value: £27,000   As part of London Underground Limited’s 3 Year Escalator Refurbishment Plan, we carried out cleaning and painting works within Escalators 1 & 3 Upper and Lower Machine Chambers at Brixton Station. We cleaned and […]

0 comments

Canary Wharf Station – New Retail Units

Project: Canary Wharf Station – New Retail Units Client: London Underground Limited – SWIP Team Works Value: £160,000 We carried out demolition, building & premises works at Canary Wharf in preparation for the New Retail Units being set up at the Station. Our works commenced with the demolition of the male public toilets including removal of […]

0 comments

Canning Town Station – Removal of Platform Supports

Project: Canning Town Station – Removal of Platform Supports Client: Tube Lines Limited Works Value: £10,500   There were 12 outriggers in total, 6 along each platform located some 14.5m apart.  Each was formed of a single spine beam with 10 side spur members and 22 tie bars. Due to the arrangement of the outriggers, access […]

0 comments

Chalfont & Latimer Station – Fence

Project: Chalfont & Latimer Station – Fence Client: Tube Lines Limited – BCV/SSL Minor Works Works Value: £4,500   D&D Rail Limited were required to install an additional fence panel above the existing to stop the public from climbing over the existing fence line and onto the platform. We fabricated new fence panels and drilled and […]

0 comments

Charing Cross Station – Escalator 1 & 3 Replacement

Project: Charing Cross Station – Escalator 1 & 3 Replacement Client: London Underground Works Value: £73,000 Following on from the civil changes and the installation of new escalator frames and step chains etc. D&D Rail commenced the premises work which involved central staircase refurbishment, upper and lower circulation area tiling, re decorations within machine chambers and […]

0 comments

Charing Cross Station – FIRAS Works

Project: Charing Cross Station – FIRAS Works Client: TfL Works Value: £6,000 D&D Rail Limited were required to fire protect the air flow ductwork within the new retail unit at Charing Cross Underground Station.  DDR cladded the steel ductwork with Rockwool Firepro Slabs, which was fixed using Rockwool Firepro Glue and screws.  All exposed fibrous […]

0 comments

Cockfosters Depot & Edgware Depot – Security Works

Project: Cockfosters Depot & Edgware Depot – Security Works Client: Tube Lines Limited Works Value: £16,000 As part of our Minor and Intermediate framework we were tasked with carrying out a few minor tasks at Cockfosters & Edgware Depots as part of the Access Control Works: Cockfosters Depot The card readers either side of the Depot […]

0 comments

Cockfosters Depot – DDM Office Refurbishment

Project: Cockfosters Depot – DDM Office Refurbishment Works Client: Tube Lines Limited Works Value: £13,000   The DDM Office (1/803) required minor refurbishment under our framework for Minor & intermediate Works.  Works carried out included the following: The existing floor was a pre-1930, parquet floor and D&D was advised that this would be re-conditioned in the near […]

0 comments

Cockfosters Depot – New Security Gate House Project – Civil Works

Project: Cockfosters Depot – New Security Gate House Project Client: Tube Lines Limited Works Value: £40,000   This work package is for the Enabling Works for the installation of a new Security Cabin at the Entrance to Cockfosters Depot.  Our scope was for the construction of a concrete base to support the new cabin, the formation […]

0 comments

Dual Power Project – Civil Works to Various Locations

Project: Dual Power Project – Civil Works to Various Locations Client: Tube Lines Limited Works Value: £70,000 This contract was for six Signalling Equipment Rooms (SERs) located at Kilburn, Willesden Green, Dollis Hill, Kingsbury, Queensbury & Canons Park Stations. These stations only had single power supplies fed to them, as part of the Jubilee Line Upgrade Works […]

0 comments

Earl’s Court Station – Lifts 3 & 4 – Civils Work

Project: Earl’s Court Station – Lifts 3 & 4 – Civils Work Client: London Underground Limited – Capital Programmes Directorate Works Value: £58,000   The existing steelwork within the Counterweight Shaft required refurbishment as contained surface corrosion.  The Counterweight Shaft is designated as a confined space.  Using trained staff and working in accordance with a […]

0 comments

East Putney, Parsons Green & Wimbledon Park Stations – Platform Works

Project: East Putney, Parsons Green & Wimbledon Park Stations – Platform Works Client: IPS Works Value: £100,000   Works consisted of excavation on the platforms and formation of new reinforced concrete lighting column bases complete with reinstatement of platform surfaces. New duct routes were also excavated and installed on the platforms for new services to […]

0 comments

Edgware Depot – Kitchen

Project: Edgware Depot – Kitchen Client: Tube Lines Limited Works Value: £7,000   These works consisted of the supply and installation of a small kitchen in the Security Hut at the entrance to Edgware Depot. In addition to this we relocated and fixed an Armco Barrier around the perimeter of a new car parking area, broke […]

0 comments

Edgware Road Station – Ambience Works

Project: Edgware Road Station – Ambience Works Client: Tube Lines Limited – BCV/SSL Minor Works Works Value: £6,000   As part of the combined ambience works project, D&D Rail Limited were required to remove all loose and damaged paint from the timber surface of the west side external face of the overbridge, the surface was then […]

0 comments

Edgware Station – Walkway

Project: Edgware Station – Walkway Client: Tube Lines Limited Works Value: £78,000   Our scope of works included the provision of a new walkway, door and associated lighting at Edgware Station between the train shed and the north end of platform 3 to allow train drivers more convenient and safer access to and from trains stabled […]

0 comments

Euston Station – Parcel Deck Accommodation – Premises Package

Project: Euston Station – Parcel Deck Accommodation Client: Tube Lines Limited Works Value: £20,000   These works were associated with the refurbishment of a suite of staff accommodation including male toilets/ showers, lobby, mess room and the creation of a new drying room. The following works were undertaken during this project: Male Toilet/ Showers: Works […]

0 comments

Euston Station – Airwave Dual Cab Sites Enabling (Civils)

Project: Euston Station – Airwave Dual Cab Sites Enabling (Civils) Client: Tube Lines Limited Works Value: £25,000   This work package was for the Civils Works as part of the Airwave Dual Cab Sites Enabling Project.  The works were to provide support for the relocation of existing power cabinets and installation of new power cabinets at […]

0 comments

Golders Green Station – Platform Strengthening Project

Project: Golders Green Station – Platform Strengthening Project Client: YJLi Works Value: £50,000 Platform strengthening works comprising of additional supports being installed underneath the disused platform so that this could be used to take the required passenger loadings and become a ‘live’ platform. The supports comprised of steel beams, props and harjacks with the best […]

0 comments

Green Park Station – Reinstallation of VE Panels

Project: Green Park Station – Reinstallation of VE Panels Client: Tube Lines Limited Works Value: £65,000   D & D Rail Ltd where recently instructed to reinstall 344 No VE Panels at Green Park Station.  These VE Panels had been removed during station modernisation works carried out on the Victoria Line platforms and Lower Concourse by […]

0 comments

Greenford Station – Phase I – Civil works in conjunction with installation of Escalator 1

Project: Greenford Station – Phase I – Civil Works in Conjunction with Installation of Escalator 1 Client: London Underground Limited – L&E Team Works Value: £230,000   Our task was to carry out the civil works in conjunction with new install of Escalator 1 at Greenford Station.  These works involved the following: Temporary cable protection was […]

0 comments

GRP Ballast Board Installation to Bridges at Berkshire, Wiltshire and Birmingham –

Project: Installation of GRP ballast Board to Bridges at Berkshire, Wiltshire and Birmingham Client: Osborne (for Network Rail) Works Value: £90,000   The sites had to be set up in mostly in remote locations and power had to run to these worksites with task lighting provided for large areas for night time possession working.  Welfare […]

0 comments

Hammersmith Service Control Centre – Premises Works

Project: Hammersmith Service Control Centre – Premises Works Client: TfL Four Lines Modernisation Works Value: £30,000   Our scope of works included the provision of premises works including floor finishes and penetrations to install new floor vents and service grommets. Survey Of Existing Room Condition Prior to commencing any works D&D Rail had to undertake […]

0 comments

Hammersmith Station – Congestion Relief – New Station Entrance

Project: Hammersmith Station – Congestion Relief – New Station Entrance Client: London Underground Limited – SWIP Team Works Value: £220,000   As part of the Congestion Relief Programme we carried out the Premises work for the new station entrance at Hammersmith (H & C Line) Station. Our works commenced with the removal and disposal of the […]

0 comments

Heathrow T123 Station – SMEP Firestopping

Project: Heathrow T123 Station – SMEP Firestopping Client: Tube Lines Limited Works Value: £55,000   As a FIRAS approved contractor, we were instructed to carry out the permanent fire stopping and fire compartmentation for the Heathrow T123 SMEP Project.  During the course of the SMEP project at this station several contractors were tasked with making […]

0 comments

High Barnet Sidings – Walkways

Project: High Barnet Sidings – Walkways Client: Tube Lines Limited Works Value: £76,000   Under our Minor and Intermediate works framework for Tube Lines there was a requirement at this location for existing drivers’ walkways between various sidings to be extended and new hardstand areas constructed. There were also various walkways removed and the areas re-surfaced, […]

0 comments

Highgate Depot Sidings – Fencing Works

Project: Highgate Depot Sidings – Fencing Works Client: Tube Lines Limited Works Value: £40,000 At Highgate Depot Sidings we are on behalf of TLL installing approximately 130m of new 2.40m high chain link demarcation fence between Depot roads 8 & 9.  Work is being carried out at weekends during 8 – 10 hour Possessions. The works […]

0 comments

Highgate Service Control Centre – Replacement of Vehicle Road Blocker

Project: Highgate Service Control Centre – Replacement of Vehicle Road Blocker Client: Tube Lines Limited Works Value: £25,000   The Vehicle Blocker on the access road to the Service Control Centre at Highgate was to be replaced due to safety concerns.  D&D Rail were contracted to carry out the civils work associated with this activity.  Works […]

0 comments

Holborn Station – Tiling Repairs

Project: Holborn Station – Tiling Repairs Client: LUL Works Value: £23,000   Station hoardings were installed to the existing tiled flooring on the upper and lower concourses on Escalators 1-3 as part of the escalator repair works. Where the floor tiles were damaged due to the hoarding we had to replace various damaged tiles to both […]

0 comments

Holborn Station Machine Chambers 1 to 3 – Cleaning & Decorating Works

Project: Holborn Station Machine Chambers 1 to 3 – Cleaning & Decorating Works Client: LUL – L&E Team Works Value: £66,000.00   Following the refurbishment of the escalators by LUL we were given an order for comprehensive cleaning and repainting of the Machine Chambers. During the cleaning and painting works we protected LUL assets at all […]

0 comments

Kennington Station – Replacement of Defective Delta Lining

Project: Kennington Station – Replacement of Defective Delta Lining Client: Tube Lines Limited Works Value: £170,000   We were tasked with the replacement of defective DELTA Lining on the Platform 4 walls.  Works at high level were carried out off of mobile towers erected either onto the track bed or off of pit platforms. The […]

0 comments

Kilburn Station – Roof Works

Project: Kilburn Station – Roof Works Client: Tube Lines Limited Works Value: £70,000   The existing roof asset over the Station Entrance and Booking Hall located between the suspended track lines had a problematic water ingress issue.  Our task was to clean the existing roof covering of moss dirt and foliage, cut away damaged sections […]

0 comments

Kilburn Station – Roof Works

Project: Kilburn Station – Roofing Works Client: Tube Lines Limited Works Value: £70,000   The existing rendered walls to Upper & Lower Roof Areas required attention due to water ingress into the Station Entrance below.  As part of our framework for Minor & intermediate Works we were required to clean off the existing debris, scrape off […]

0 comments

Kings Cross Station & Walthamstow Station – UMC & LMC Cleaning and Painting

Project: Walthamstow Station & Kings Cross Station – UMC & LMC Cleaning and Painting Client: London Underground Limited – L&E Team Works Value: £56,000   We carried out cleaning and painting works at Walthamstow Central Station (Escalators 1&3) and Kings Cross Station (Escalators 7&9) in the Upper and Lower Machine Chambers as part of LUL’s […]

0 comments

Kingsbury Station – Re-bedding Tactiles

Project: Kingsbury Station – Re-bedding Tactiles Client: Tube Lines Limited Works Value: £72,000 The majority of the tactiles on Platforms 1 & 2 at Kingsbury Station were found to be loose and uneven.  The joint between the tactiles and the platform nosings was also found to have fragmented over time.  Our scope was to remove all of […]

0 comments

Kingsbury Station – Water Ingress Works

Project: Kingsbury Station – Water Ingress Works Client: Tube Lines Limited Works Value: £15,000 Existing Lift Lobbies to both Platforms 1&2 had issues with water ingress believed to be appearing from underside of structural slab.  Our task was to expose the structural slab below FFL and create new construction joints complete with water proof sealant […]

0 comments

Latimer Road Station – Ambience Works

Project: Latimer Road Station – Ambience Works Client: Tube Lines Limited – BCV/SSL Minor Works Works Value: £2,000   As part of the combined ambience works project, D&D Rail Limited were required to repair and prepare the concrete lintel and the entrance wall within the ticket hall as this was saturated with water ingress.  We were […]

0 comments

Leicester Square – Central Kiosk Redecoration

Project: Leicester Square – Central Kiosk Redecoration Client: Tube Lines Limited – BCV Minor Works Works Value: £3,800   The Centre Kiosk area was originally empty and used for a floral display when the station first opened.  The circular central glass area was built later and used as a display unit before becoming a control room. […]

0 comments

Leicester Square Station – Low Carbon Project

Project: Leicester Square Station – Low Carbon Project Client: Tube Lines Limited Works Value: £230,000 As part of the Low Carbon Project works at Leicester Square Station, various services i.e. ducting, hot & cold water feeds, cabling, conduit were installed through compartment walls.  Our task was to reinstate the compartment of each room altered by […]

0 comments

Liverpool Street Station – Machine Chamber Works

Project: Liverpool Street Station – Machine Chamber Works Client: LUL Works Value: £35,000 Our task was to clean the Upper & Lower Machine Chambers walls & floors to a height of 1.8m and paint handrails and staircase nosings including engineering steps under escalator 4&6.  These works include scraping loose flaky paint off walls & floors and […]

0 comments

Manor House – Drainage Works

Project: Manor House Station – Drainage Works Client: Tube Lines Limited Works Value: £7,000   As part of our framework for Minor & intermediate Works we were required to fabricate and replace the existing stair drainage channel gratings on Exits 1- 5 & 7.  This also included cleaning out all drainage channels and gratings on each […]

0 comments

Mill Hill East – Platform Replacement

Project: Mill Hill East Station – Platform Replacement Client: Tube Lines Limited Works Value: £150,000   Works at this station comprised of the replacement of the existing platform decking/ surfacing and defective structural timber members beneath the platform.  In addition to this we are to remove the lead based paint from the lighting standard support steelwork. […]

0 comments

Moorgate Station – Construction of New SER Room

Project: Moorgate Station – Construction of New SER Room Client: Tube Lines Limited Works Value: £113,000   Construction of a new SER room within an existing lift shaft at Moorgate Station.  The new SER was to be built 3 metres up the shaft, supported on a steel superstructure. Our works on this project commenced as […]

0 comments

Moorgate Station – Fire Stopping Works

Project: Moorgate – Fire Stopping Works Client: London Underground Limited – SWIP Works Value: £9,400   As an approved FIRAS accredited contractor, we were tasked with upgrading the fire stopping in the PPR Lift Area to provide 1 hour fire compartmentation. Existing damaged Supalux boards were removed and the voids behind were filled with Rockwool slabs. […]

0 comments

Moorgate Station – PRM Lift

Project: Moorgate Station – PRM Lift Client: LUL – SWIP Works Value: £165,000   Our task was to install RMD Kwikform Superslim Soldier components in two forms to act as supporting and working platform systems.  The first form was to erect and prop the underside of 2/291 Mess Room floor slab external of the new lift […]

0 comments

Morden Station – New Stepping Back Office (Premises, Civils, Electrical and Fire)

Project: Morden Station- New Stepping Back Office (Premises, Civils, Electrical and Fire) Client: Tube Lines Limited Works Value: £125,000   We were awarded a work package for the formation of a new Stepping Back Office at Morden Station.  This work package included Premises, Civils, Electrical and Fire scopes.  The existing DMT’s Office was to have a […]

0 comments

Mornington Crescent Station – Platforms 1&2 Hoarding Installation

Project: Mornington Crescent – Platforms 1 & 2 Hoarding Installation Client: Tube Lines Limited Works Value: £22,000   To support the re-rail and sleeper rehabilitation programme, our task was to install storage hoardings for the project.  These were located at the tail wall end of Platform 1 (Northbound) and at the head wall end of Platform […]

0 comments

Neasden Depot – FIRAS Works

Project: Neasden Depot – FIRAS Works Client: Orion Engineering on behalf of SSE Plc Works Value: £7,500   There are two new rooms located at Neasden Depot (SER & ESR) that were built by others.  The LUL Fire Team produced a ‘Condition Report’ to bring the room up to a one hour fire compartment, and DDR […]

0 comments

Night Tube – Enabling Works – Collapsible Gate Project

Project: Night Tube – Enabling Works – Collapsible Gate Project Client: Tube Lines Limited Works Value: £60,000   We were required to manufacture and install bespoke portal frames for housing collapsible gates to aid station staff once the Night Tube went live at Canning Town, Liverpool Street, London Bridge & Piccadilly Circus Stations.  The frames were […]

0 comments

North Acton Station – Ambience Works

Project: North Acton Station – Ambience Works Client: Tube Lines Limited – BCV/SSL Minor Works Works Value: £8,500 As part of the Ambience Package, D&D Rail were required to redecorate the waiting room 2/436 on platform 1 at North Acton Station. We completed the works during engineering hours and the works consisted of stripping the paint […]

0 comments

North Harrow Junction – FIRAS Works

Project: North Harrow Junction – FIRAS Works Client: SSE Works Value: £17,000   Two new rooms have been formed at North Harrow Junction (SER & ESR).  Our client employed the services of DDR to maintain a one hour fire compartment within these rooms, where penetrative works to the building fabric had been carried out by others.  […]

0 comments

Northwick Park – Slalom Hoop Barriers

Project: Slalom Hoop Barriers Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £17,500 Due to the station subway being accessed by the public 24/7, motorised and mechanical vehicles have been used within the subway.  Concerns for health and safety have been raised, and DDR were asked to install 3No. Slalom Hoop Barriers on the […]

0 comments

Oxford Circus – Staircase Works

Project: Oxford Circus – Staircase Works Client: TLL-BCV Works Value: £205,000   Our task was to replace 332no. non-compliant treads over 7no. staircases on Levels 1, 5 & 6 of the Station with new compliant non-slip AATi pieces.  These works involved removal of existing nosings, repairs to existing substrate with Ardex products, drilling into existing substrate […]

0 comments

Paddington Station – Enabling Works – Streetworks

Project: Paddington Station – Enabling Works – Streetworks Client: UK Power Network Works Value: £12,000   We were awarded a contract for enabling works at Paddington Station.  This work was related to the replacement of the existing DC supply escalators with new HD Metro type, supplied from a new AC intake to be installed by […]

0 comments

Paddington Station – Staircase Works

Project: Paddington Station – Staircase Works Client: Tube Lines Limited – BCV Minor Works Works Value: £45,200 Our task was to lay new ceramic corduroy tactiles at the top & bottom of 6No Staircases (1/604, 2/602, 2/603, 2/604, 2/605, 2/606 & 2/608), and bottom only of 1No Staircase (1/602) to bring these up to standard of […]

0 comments

Paddington Station – UMC & LMC Works

Project: Paddington Station – UMC & LMC Works Client: London Underground Limited – L&E Team Works Value: £25,000   We carried out cleaning and painting works within the Upper and Lower Machine Chambers at Paddington Station as part of London Underground Limited’s 3 Year Escalator Refurbishment Plan.  All existing assets had to be carefully protected for the duration […]

0 comments

Perivale Station – Roof & Ladder Works

Project: Perivale Station – Roof & Ladder Works Client: LUL – SWIP Works Value: £145,000   The asphalt roofs of Perivale Station were found to be in a poor state of repair.  On the upper roof and canopy the asphalt was found to be dilapidated.  On the upper roof this had caused  the vertical asphalt to […]

0 comments

Ruislip Depot – Pit Road Drainage

Project: Ruislip Depot – Pit Road Drainage Client: Tube Lines Limited Works Value: £5,000   We were requested to attend a site meeting at Ruislip Depot to help solve a problem with the drainage of 2 No. Pit Roads.  The Depot ends of the Pit Roads had been bunded to retain contaminated water produced during […]

0 comments

Ruislip Depot – Vehicle Load Gauges

Project: Ruislip Depot – Vehicle Load Gauges Client: Tube Lines Limited Works Value: £22,000   As part of our framework for Minor & intermediate Works we were asked to supply and install 2 No Vehicle Load Gauges over roads at Ruislip Depot.  The gauges were to be installed on non-electrified track in areas of the depot […]

0 comments

Russell Square Station – Lifts 1-2-3 – Civil Enabling Works

Project: Russell Square Station – Lift 1, 2 & 3 – Civil Enabling Works Client: Tube Lines Limited Works Value: £70,000   As part of the Lift 1, 2 & 3 replacement works at Russell Square Station, our task was to carry the civil enabling works in conjunction with this.  Works involved the following: Lift 1 […]

0 comments

South Harrow Station – REB Base

Project: South Harrow Station – REB Base Client: Tube Lines Limited Value: £18,000 As part of our framework for Minor & intermediate Works we were required to form a hard standing concrete base to accommodate an REB unit for the local signalling interface replacement works for APJNP. We were also required to use a crane […]

0 comments

Southgate Station – Redecoration Works

Project: Redecoration Works Client: Tube Lines Limited BCV/SSL Minor Works Works Value: £85,000 Our task was to remove existing finishes and make good all areas to the lower concourse and the escalator barrel on both sides. We then applied two coats of Tikkurila LUJA paint and a top coat of Tikkurila Lacquer to the escalator […]

0 comments

Step Free Access – Making the Tube Accessible for All

Project: Step Free Access – Step Free Access (31no. Locations) Client: LUL – SWIP Works Value: £150,000   As Transport for London (TfL) announced that nine out of ten buses are now accessible, London Underground (LU) also announced it is investing more than ever before to make the Tube as accessible as possible, as quickly as […]

0 comments

Stratford Market Depot – Premises Works

Project: Stratford Market Depot – Premises Works Client: Tube Lines Limited Works Value: £90,000   D&D Rail Ltd have carried out several projects at Stratford Market Depot for TLL under the Minor Works Contract.  These projects were carried out on behalf of the security team to improve Access Control. The following tasks were undertaken as […]

0 comments

Stratford Market Depot Security Works – Installation of New Air Conditioning Unit in Security Suite

Project: Stratford Market Depot Security Works Installation of New Air Conditioning Unit Client: Tube Lines Limited Works Value: £9,542.00   Due to change of use D&D Rail were instructed to install a new Air Conditioning Unit in a room in the Security Suite at Stratford Market Depot.  The scope was to install a unit to same […]

0 comments

Stratford Station – Enabling Works – Escalators 1 & 2

Project: Stratford Station – Enabling Works – Escalators 1 & 2 Client: Tube Lines Limited Works Value: £80,000 D & D Rail were contracted with the enabling works associated with the replacement of Escalators 1 & 2 at Stratford Station. The enabling works consisted of the temporary removal and replacement of glass panels and metal barriers […]

0 comments

Stratford Station – Plunger Works

Project: Stratford Station – Plunger Works Client: Tube Lines Limited Works Value: £72,000 Our task was to install new asset posts, one per platform on Platforms 13, 14 & 15 to enable existing plunger relocation by others, to improve access for Train Operations during train arrival/departure process.  As the new posts were being installed along the […]

0 comments

Stratford Station – Signage & Handrail Installation

Project: Stratford Station – Signage & Handrail Installation Client: Tube Lines Limited Works Value: £120,000   As part of the station upgrade and improvement works in relation to Westfield and Olympic Village construction, new signage was required to be installed to direct the public from the Southern Concourse on the East Side, West Side and […]

0 comments

Temple Station – Ambience Works

Project: Temple Station – Ambience Works Client: Tube Lines Limited – BCV/SSL Minor Works Works Value: £17,000   As part of the combined ambience works project, D&D Rail Limited were required to clean, repair and prepare the ceiling and wall surfaces within the booking hall as its’ current state was tainted from the track dust being […]

0 comments

Tottenham Hale Station – Provision of Welfare, Secure Compound Area & Escalator Scaffold Access

Project: Tottenham Hale Station – Provision of Welfare, Secure Compound Area & Escalator Scaffold Access Client: London Underground Limited Works Value: £50,000 As part of the escalator upgrade works at Tottenham Hale Station, welfare and secure compound area was temporary installed (Complete with running water and drainage outlet) for site usage during the replacement of Escalator […]

0 comments

Upminster Depot – FIRAS Works

Project: Upminster Depot FIRAS Works Client: LUL SWIP Works Value: £110,000   There is a new building at Upminster Depot ‘Ancillary Building’ that was built by others.  The services of DDR were employed to install 5No new double glazed window units, strengthen existing apertures and install 9No new steel door sets (2No of these installed […]

0 comments

Various Stations – Installation of New Fall Protection System

Project: Various Stations – Installation of New Fall Protection System Client: Tube Lines Limited Works Value: £219,000   This project was for removal of the existing Kee Klamp edge protection and installation of a new Fall Protection System at Alperton, Boston Manor, Bounds Green, Burnt Oak, Chalk Farm, Colliers Wood, South Wimbledon & South Harrow […]

0 comments

Victoria Coach Station – Roof Canopy Works

  Project: Victoria Coach Station – Roof Canopy Works Client: LUL – SWIP Works Value: £134,000   Our works at Victoria Coach Station were part of the refurbishment of the roof canopy over the Main Departure Terminal.  The scope included the refurbishment of the steel structure and the replacement of the glazing on the roof canopy. […]

0 comments

Warren Street Station – Compound Removal

Project: Warren Street Station – Compound Removal Client: London Underground Limited – Nominee BCV Limited Works Value: £25,000 D & D Rail were asked to assist with the removal of the LUL Site Compound located outside of Warren Street LUL Station. We were initially asked to price to cut the cabins down into manageable sections. […]

0 comments

Waterloo International Station – Terminal Conversion Link Project

Project: Waterloo International Station – Terminal Conversion Link Project Client: YJLi Works Value: £134,000 This project was to re-open Platform 20 of Waterloo station for the use of “domestic” services with access / egress via platform 19.  This was achieved by forming two openings through the dividing wall between Platforms 19 and 20.  One opening nearest the […]

0 comments

Waterloo Station – Welfare Project Works

Project: Waterloo Station – Welfare Project Works Client: LUL – L&E Team Works Value: £17,000.00   Our task was to refurbish the redundant welfare area at Waterloo Station for the LUL Lift & Escalator Project Team.  These works included cleaning to doors, walls, floors and suspended ceilings throughout, replacing damaged sections of suspended ceilings where required, […]

0 comments

Watford South Junction – FIRAS Works

Project: Watford South Junction – FIRAS Works Client: Orion Engineering Works Value: £5,000 Two new rooms have been formed at Watford South Junction (SER & ESR).  Our client employed the services of DDR to maintain a minimum one hour fire compartment within these rooms where penetrative works to the building fabric had been carried out […]

0 comments

Watford Station – FIRAS Works

Project: Watford FIRAS Works Client: Orion Engineering for LU Fire Team Works Value: £13,600   There are two new rooms located at Watford Station (SER & ESR) that were built by others.  The LUL Fire Team employed the services of DDR to maintain a one hour fire compartment with passive fire protection works under our […]

0 comments

Wembley Park Station – FIRAS Works

Project: Wembley Park Station FIRAS Works Client: SSE Value: £14,000   There are two new rooms located at Wembley Park Station (SER & ESR) that were built by others.  The LUL Fire Team employed the services of DDR to bring the room up to a one hour fire compartment with passive fire protection works under […]

0 comments

Wembley Park Station – Bridge MR32F Structure Refurbishment

Project: Wembley Park Station – Bridge MR32F Structure Refurbishment Client: Tube Lines Limited Works Value: £250,000 This contract is for the maintenance of an existing Train Crew Accommodation Bridge MR32F at Wembley Park Station, works were required to prepare delaminated areas of steelwork to ST3 Standard followed by a re-paint to the whole structure with […]

0 comments

West Kensington Station – New Foundations

Project: West Kensington Station – New Foundations Client: Clancy Docwra Works Value: £23,000 As part of the task to provide Signal & Track Staff new accommodation, 36No new foundations were to be formed to accommodate modular units. Works included excavating trial holes for ground investigation / levelling waste ground / removal of redundant concrete pads / […]

0 comments

West Ruislip – Ambience Works

Project: West Ruislip Station – Ambience Works Client: Tube Lines Limited – BCV/SSL Minor Works Works Value: £6,000   As part of the combined ambience works project, D&D Rail Limited were required to repair and prepare the ceiling and wall surfaces within the stairwell 1/601, as in its’ current state was in poor condition.  D&D Rail […]

0 comments

Westminster Station – Replacement of Tactiles On Platforms 1 & 2

Project: Westminster Station – Replacement of Tactiles On Platforms 1 & 2 Client: Tube Lines Limited Works Value: £80,000 As part of our framework for Minor & intermediate Works we were asked to replace undersized concrete tactiles on platforms 1 & 2 of Westminster Station with full sized concrete tactiles.  Our works commenced with the […]

0 comments

Whitechapel Station – Roofing Works

Project: Whitechapel Station – Roofing Works Client: London Underground Limited Works Value: £75,000   As part of the works to install a new SER at Whitechapel Station there was a requirement to further waterproof the roof slab due to water ingress.  The initial works were carried out during a 72 hour Possession with the remainder on […]

0 comments

Wood Green Station – Cable Protection

Project: Wood Green Station – Cable Protection Client: TfL Works Value: £6,000 Our task was to install a dricon ply barrier to protect a run of connect cable trunking underneath Escalator One.  The reason for this was to prevent any damage from the Escalator Truss Removal Works which will be carried out under hot works […]

0 comments

Woodford Station – Ambience Works

Project: Woodford Station – Ambience Works Client: Tube Lines Limited – BCV/SSL Minor Works Works Value: £6,000 As part of the combined ambience works project, D&D Rail Limited were required to redecorate the walls, ceilings, skirtings and repair areas where required in Waiting Rooms 1/437, 1/281 and Ticket Halls 1/001, 1/002.  We maximised our working hours […]

0 comments

£250K-£500K

Aldgate Station – Facilities Package

Project: Aldgate Station – Facilities Package Client: London Underground Limited – Nominee SSL Works Value: £325,000   Take tenancy within offices located next to Station property.  Use space to partition and create individual areas for each contractor including a meeting room and welfare area. Provide a portacabin for client office set up. Installation of telephone […]

0 comments

Aldwych Station – Refurbishment

Project: Aldwych Station – Refurbishment Client:  Tube Lines Limited Works Value: £350,000 Works included general refurbishment of disused station, currently being utilised by London Underground as a station for marketing purposes (film sets, exhibitions, army and police training). Works comprised of upgrading various rooms to LUL Section 12; renewal of doors; removal of various trial […]

0 comments

Archway Station – Construction of new signalling equipment room

Project: Archway Station – Construction of New Signalling Equipment Room Client: Tube Lines Limited Works Value: £280,000   Construction of a new SER in a vent shaft at Archway Station. The new SER was to be built 2 metres above the existing CER, supported on a steel framework fixed to the tunnel ring/shaft bolts. The new […]

0 comments

Arsenal Station – Subway Flooring

Project: Arsenal Station – Subway Flooring Client: Tube Lines Limited Works Value: £416,000   Our works to replace the non-compliant flooring at Arsenal Station were completed 9 weeks ahead of programme.  This was made possible by the close co-operation between JNP, D&D Rail Ltd, LUL Management and Station Staff.  With agreement from LUL Station Management, our […]

0 comments

Belsize Park Station – Modernisation & Enhancement Projects

Project: Belsize Park Station – Modernisation & Enhancement Projects Client: YJLi Works Value: £350,000 Belsize Park Station underwent a modernisation & enhancement programme. D&D Rail Ltd carried out repair work to all areas of the station, The work was carried out during Engineering hours working times. Existing wall and floor tiles were removed from all […]

0 comments

Bond Street Station – ISOR Steelwork and Premises Package

Project: Bond Street Station – ISOR Steelwork and Premises Package Client: Tube Lines Limited – SWIP Team Works Value: £400,000 The existing SOR (Station Operations Room) was due to be refurbished so the staff operating the Station needed to be temporarily housed during this time.  Our task was to build an ISOR (Interim Station Operations Room) […]

0 comments

Euston Square Station – Refurbishment

Project: Euston Square Station – Refurbishment Client: Metronet SSL Works Value: £350,000 General refurbishment of and change over of rooms for ‘Connect Contract’. Steel frame installation: Steel frames were installed to take the weight of the subway above. Existing walls were removed and a full CDS drawn up to support the above subway. New door […]

0 comments

Kings Cross Station – Escalators 1, 2, 3 Civil & Premises Works

Project: Kings Cross Station – Escalators 1, 2, 3 Civil & Premises Works Client: London Underground Limited – L&E Team Works Value: £428,000   As part of the of Escalators 1-3 replacement works at King’s Cross Station our task was to carry out the Civil & Premises works in conjunction with new install.  Works included the […]

0 comments

Northfields Depot – Refurbishment of the Duty Depot Manager’s Office & Construction of a new Mezzanine Area

Project: Northfields Depot – Refurbishment of the Duty Depot Managers Office & Construction of a New Mezzanine Area Client: Tube Lines Limited Works Value: £425,000   Our works for Northfields Depot were completed as part of our Minor and Intermediate Framework with Tube Lines.  This project was for the refurbishment of the Duty Depot Manager’s […]

0 comments

RVAR Surveys – Various Locations

Project: RVAR Surveys – Various Locations Client: London Underground Works Value: £300,000   D&D Rail have carried out a large number of surveys for the RVAR project for London Underground. These surveys were carried out to assess the feasibility of raising an area of the platform to the level of the train carriage. Our surveys were […]

0 comments

Stanmore Station – Modernisation & Enhancement Project

Project: Stanmore Station – Modernisation & Enhancement Project Client: Tube Lines Limited Works Value: £275,000 D&D Rail Ltd were awarded the contract at Stanmore Station for the refurbishment of the platform canopy. The works consisted of complete removal of all existing paint coating from the canopy and supporting steelwork. The platforms, surrounding assets and cabling […]

0 comments

Stepney Green Station – Walkway

Project: Stepney Green Walkway 1/201 Installation of Elevated Slab & Works to Staircase 1/604 Client: TfL SWIP ASPIRE Works Value: £350,000   D&D Rail were instructed to undertake works to construct a new walkway slab 1/201 within Stepney Green station.  The existing slab currently forms the ceiling of various equipment rooms within the station. Our works […]

0 comments

Totteridge & Whetstone Station – Modernisation & Enhancement

Project: Totteridge & Whetstone Station – Modernisation & Enhancement Client: Fitzpatrick Contractors Limited Works Value: £400,000 Totteridge & Whetstone Station underwent a modernisation & enhancement programme. D&D Rail Ltd carried out repair work to all areas of the station, this included repairs and modernisation to the existing main building, repairs and modernisation to platform buildings […]

0 comments

Walthamstow Central Station – New Build Sub Station

Project: Walthamstow Central Station – New Build Sub Station Client: Birse Metro Limited Works Value: £265,000 Walthamstow Central was undergoing Step Free Access alteration and new lifts shafts had been installed on site by the main contractor. D&D Rail Ltd were awarded the contract to build a new single story sub-station to power the lifts. […]

0 comments

£500K-£1M

Bank Station – Escalator 8, 9, 10 & 11 – Civils and Cable Protection

Project: Bank Station – Escalator 8, 9, 10 & 11 Civils and Cable Protection Client: London Underground Limited – Nominee BCV Limited Works Value: £500,000   Under the auspices of the LULN, L&E Framework D & D Rail Ltd were awarded a contract to carry out the Civils Enabling works for the replacement of Escalators 8 9 […]

0 comments

Brent Cross Station – Modernisation & Enhancement

Project: Brent Cross Station – Modernisation & Enhancement Client: Tube Lines Limited Works Value: £750,000 The majority of the below works were completed within a 48 hour possession weekend. Strip and redecorate station canopy Install new platform service ducts Tactile paving General refurbishment works to the ticket hall  

0 comments

Chancery Lane Station – Civil & Premises Works

Project: Chancery Lane Station Civil & Premises Works Client: London Underground Limited – L&E Works Value: £525,000   Escalators 1&3 at Chancery Lane Station required replacing under the L&E Framework.  DDR were contracted with both the civil & premises aspects of the project, and works were carried out over three phases and three Station Closures […]

0 comments

East Finchley Station – Modernisation & Enhancement Project

Project: East Finchley Station – Modernisation & Enhancement Project Client: Fitzpatrick Contractor Limited Works Value: £800,000 Station modernisation works including: Replacement of suspended ceilings. Replacement floor coverings. Replacement doors. Replacement platform paving slabs. Replacement block paving. Replacement nosing stones. Replacement glazing. New drainage. Brickwork repairs and re-pointing. Cleaning works. Refurbishment of bronze features. Refurbishment of […]

0 comments

Hampstead Station – Modernisation & Enhancement

Project: Hampstead Station – Modernisation & Enhancement Client: YJLi Works Value: £500,000 General station modernisation throughout whole of the station including the following works: Repairs to stairs, walls and floor finishes Brickwork repairs and cleaning Replacement stair nosings and tread finishes Re-pointing existing brickwork Formation of new Station Control Room including blockwork walls, internal and […]

0 comments

Heathrow T123 Station – LUL

Project: Heathrow T123 Station – LUL Client: Tube Lines Limited Works Value: £750,000   D & D Rail Ltd completed the design & build project at Heathrow 123 LUL Station.  The SFA and Ambiance Project at Heathrow 123 LUL Station required a refit of the old British Transport Police accommodation.  This accommodation was to be […]

0 comments

Hendon Central Station – Step Free Access

Project: Hendon Central Station – Step Free Access Client: Tube Lines Limited Works Value: £950,000 As part of the Step Free Access programme D&D Rail Ltd was awarded the contract to install a lift shaft at Hendon Central. The position of the new lift shaft was to be positioned central within the island platform. Minimum […]

0 comments

Kennington Station – NLE Civil, Premises, Mechanical & Electrical Works

Project: Kennington Station – NLE Civil, Premises, Mechanical & Electrical Works Client: FLO Works Value: £900,000 These works are still in progress and this will therefore be updated in due course.  Work completed to date includes:- Repairs to kicker walls in each passage to enable installation of wind posts Apply screed to floors in passage […]

0 comments

Queen’s Park Station – Route Enabling

Project: Queen’s Park Station – Route Enabling for Connect Contract at Stonebridge Park, Wembley Central to Stonebridge Park and Queen’s Park Stations Client: Tube Lines Limited Works Value: Overall £700,000 New hanger routes, new SDP base, antenna base, new concrete troughing and core drilling.  

0 comments

Stonebridge Park Station – Route Enabling

Project: Stonebridge Station – Route Enabling for Connect Contract at Stonebridge Park, Wembley Central to Stonebridge Park and Queen’s Park Stations Client: Tube Lines Limited Works Value: Overall £700,000 Route Enabling for Connect Contract at Stonebridge Park, Wembley Central to Stonebridge Park and Queen Park Stations New hanger routes were installed between Wembley Central and […]

0 comments

Various Stations – Tactile Installation

Project: Various Stations – Tactile Installation Client: Tube Lines Limited Works Value: £520,000 Works carried out on surface stations and deep level tube stations. Works involved removing the existing platform finishes and installing a new line of ceramic and concrete tactile paving directly behind the existing platform nosing stones. All plant, materials and rubbish delivered […]

0 comments

Wembley Central Station – Route Enabling

Project: Wembley Central Station – Route Enabling for Connect Contract at Stonebridge Park, Wembley Central to Stonebridge Park and Queen’s Park Stations   Client: Tube Lines Limited Works Value: Overall £700,000   New concrete troughing, antenna base, coupler bases and underpass cable routes.  

0 comments

£1M-£5M

Acton Town Station – Step Free Access & Modernisation Project

Project: Acton Town Station – Step Free Access & Modernisation Project Client: Tube Lines Limited Works Value: £1.2 Million Station modernisation works including strip-out of existing rooms, demolition and formation of new rooms including the new secure suite.  This included the following: Demolition and strip out of existing fixtures and fittings. Removal of floor finishes. […]

0 comments

Boston Manor Station – Installation of New SDP Base

Project: Boston Manor Station – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot Client: Tube Lines Limited Works Value: Overall £4 Million   New trackside cable containment, new trackside equipment bases and formation/upgrade of new rooms within station environments. Please see below for selection works. Works at Boston Manor […]

0 comments

Bounds Green Station – Modernisation & Enhancement Project

Project: Bounds Green Station – Modernisation & Enhancement Project Client: YJLi Works Value: £1 Million General station modernisation throughout whole of the station including the following works: Removal of floor and wall tiling. Repairs to walls, floors and general finishes including rendering. Stair repairs. Demolition. Core drilling. Replacement doors. New windows. Re-pointing existing brickwork.  

0 comments

Covent Garden Station – Congestion Relief

Project: Covent Garden Station – Congestion Relief Client: Tube Lines Limited Works Value: £1.4 Million   The purpose of the works was primarily the creation of additional space that was previously utilised as a Bureau De Change at ground floor level to allow for installation of additional exit gates. The existing Ticket Office remained with […]

0 comments

Earl’s Court Station – Modernisation

Project: Earl’s Court Station – Modernisation Client: Metronet SSL Works Value: £4.1 Million   Major building works in association with the modernisation of Earls Court Station including but not exclusively: The demolition of existing South side accommodation and the reconstruction of new ticket offices and service accommodation including the provision of new concrete slabs over the […]

0 comments

Finchley Road Station – Modernisation & Enhancement Project

Project: Finchley Road Station – Modernisation & Enhancement Project Client: Tube Lines Limited Value: £1.8 Million   Station modernisation works including strip-out of existing rooms, demolition and formation of new rooms including the new secure suite. This included the following: Demolition and strip out of existing fixtures and fittings Removal of floor finishes Removal and replacement […]

0 comments

Greenford Station – Phase II & III – L&E Civils Works

Project: Greenford Station – Phase II & III – Civil Works in Conjunction with Installation of New Inclined Lift and the Replacement of Existing Central Staircase Client: London Underground Limited – L&E Team Works Value: £1.4 Million As part of the installation of new Inclined Lift & Central Staircase at Greenford Station, our task was to […]

0 comments

Hyde Park Station – Modernisation

Project: Hyde Park Station – Modernisation Client: YJLi Works Value: £1.3 Million Replacement of platform surface (two platforms) including re alignment of platform nosings.  Complete strip and redecoration of trackside painted surface including hacking off and re-rendering substantial areas. Re-configuration of trackside tile band. Tiling on platforms and other public areas. Renewal of suspended ceiling […]

0 comments

Jubilee Line Extension – New Ticket Office

Project: Jubliee Line Extension – New Ticket Office Client: Lovell Construction Limited Works Value: £2.5 Million   The Jubilee Line Extension required new Ticket Offices to be installed at all stations from Westminster through to Stratford this was a design and build project working from the original JLE concept drawing. The ticket offices were taken through […]

0 comments

Northfields Depot – SDP & Troughing Installation

Project: Northfields Depot – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot Client: Tube Lines Limited Value: Overall £4 Million   The new SDP base was constructed adjacent to the Depot access road.  A new cable riser and draw pit were incorporated in the pour along with existing cable […]

0 comments

South Ealing Station – Post Route & SDP Installation

Project: South Ealing Station – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot Client: Tube Lines Limited Value: Overall £4 Million   New trackside cable containment, New SDP base and antenna base were constructed. The areas when these were installed were cleared of vegetation etc. and excavated. Type 2 […]

0 comments

South Wimbledon Station – Modernisation

Project: South Wimbledon Station – Modernisation Client: YJLi Works Value: £1.37 Million   Replacing individual and groups of tiling, matching into existing, to public and non-public areas including ticket office, platforms and trackside. Ceramic and V.E. tiling replaced. Renewed flooring in ticket office Plaster repairs to walls and ticket office ceiling. Overhauling skylight, replacing glazing […]

0 comments

Waterloo Eurostar – Peak Hour Subway Conversion Project

Project: Waterloo Eurostar – Peak Hour Subway Conversion Project Client: YJLi Works Value: £2.04 Million This project was driven by Network Rails desire to ease passenger flows from their main line terminus at Waterloo in to the LUL network.  This was to be achieved by introducing three new link stairways and three new gate lines. […]

0 comments

£5M-£10M

Leytonstone Station – Connect BCV

Project: Leytonstone Station – Connect BCV – Various Enabling Packages on Theydon Bois Station, Leytonstone Station and White City Depot Client: Birse Metro Limited – On Behalf of Metronet BCV Works Value: Overall £5.4 Million   Within a very restricted site bordered by service cables and with the requirement to maintain access through the site […]

0 comments

Theydon Bois Station – Replacement of 2 Platform Surfaces

Project: Theydon Bois Station – Connect BCV – Various Enabling Packages on Theydon Bois Station, Leytonstone Station and White City Depot Client: Birse Metro Limited – On Behalf of Metronet BCV Works Value: Overall £5.4 Million   Replacement of platform surface (two platforms) including re alignment of platform nosings. Complete strip and redecorate of trackside […]

0 comments

White City Depot – Constucting Reinforced Concrete Slabs

Project: White City Depot – Connect BCV – Various Enabling Packages on Theydon Bois Station, Leytonstone Station and White City Depot Client: Birse Metro Limited – On Behalf of Metronet BCV Works Value: Overall £5.4 Million   We have worked at two locations within the Depot constructing reinforced concrete slabs. The work involved over site […]

0 comments

£10M & Above

C01 – Civils Package Works

Project: C01 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s. Enabling works for the CO1 ring. This work includes […]

0 comments

Hanger Lane Station – CMS works

Project: Hanger Lane Station – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   Project: Fluor Connect Enabling Works – New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases. The areas when these were installed were cleared of vegetation etc. and excavated. Type […]

0 comments

Holborn Station – CMS installation

Project: Holborn Station – Fluor Connect Enabling Works Client: Flour Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable containment installation within existing vent shaft as […]

0 comments

M032, M034 & M036 – Fluor Connect Enabling Works

Project: MO32, MO34 & MO36 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable post installation for new trackside cabling […]

0 comments

Redbridge Station – Removal of Existing HVAC & Replacing with New System

Project: Redbridge Station – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Removal of existing HVAC and replacing with new system. Installing […]

0 comments
Touch to Call!