South Harrow Station: – REB Base

Project: South Harrow Station – REB Base

Client: Tube Lines Limited

Value: £18,000

As part of our framework for Minor & intermediate Works we were required to form a hard standing concrete base to accommodate an REB unit for the local signalling interface replacement works for APJNP.

We were also required to use a crane to lift a 4 tonne REB unit into place on the newly formed concrete base.

The works also included forming 4 No. 100mm diameter penetrations into the high level brickwork of the IMR adjacent to the REB to enable others to feed new cables from the IMR to the REB.

All 4No. penetrations was required to be fire stopped until the works to the cables commenced.

 