Project: Boston Manor Station – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot
Client: Tube Lines Limited
Works Value: Overall £4 Million
New trackside cable containment, new trackside equipment bases and formation/upgrade of new rooms within station environments. Please see below for selection works.
Works at Boston Manor involved trackside works to install a new SDP base. The existing cable run was temporarily restrained whilst the base was excavated. A new cable riser was formed and also new ducts. The existing post route had new metal posts installed to take the new cables.