Cockfosters Depot: – DDM Office Refurbishment

Project: Cockfosters Depot – DDM Office Refurbishment Works

Client: Tube Lines Limited

Works Value: £13,000

 

The DDM Office (1/803) required minor refurbishment under our framework for Minor & intermediate Works.  Works carried out included the following:

The existing floor was a pre-1930, parquet floor and D&D was advised that this would be re-conditioned in the near future.  We were asked to install a non-slip floor covering which could be easily maintained and easily removed without damage to the existing flooring, with the existing flooring to remain intact.  We achieved this task by laying ply and over-laying this with Altro non-slip flooring to create a floating floor covering.

Redecoration was required to all areas including walls, doors & frames and surface mounted pipes.  It was decided by the client to apply Piccadilly blue to the bottom half and battle ship grey to the top half of the walls.

Finally, the existing ceiling tiles were replaced in the original ceiling grid.

 

Touch to Call!