Edgware Road Station: – Ambience Works

Project: Edgware Road Station – Ambience Works

Client: Tube Lines Limited – BCV/SSL Minor Works

Works Value: £6,000

 

As part of the combined ambience works project, D&D Rail Limited were required to remove all loose and damaged paint from the timber surface of the west side external face of the overbridge, the surface was then prepared ready to receive an under coat and top coat of paint to protect external timber surfaces from the elements.  The two external column base surfaces were prepared and repaired to receive 2 coats of paint to match the existing colour scheme.

 

Touch to Call!