Project: Finchley Road Station – Modernisation & Enhancement Project
Client: Tube Lines Limited
Value: £1.8 Million
Station modernisation works including strip-out of existing rooms, demolition and formation of new rooms including the new secure suite. This included the following:
- Demolition and strip out of existing fixtures and fittings
- Removal of floor finishes
- Removal and replacement of stair nosings and tread finishes
- Removal and replacement of platform nosing stones
- Refurbishment of existing fixtures and fittings and existing GLAP
- Replacement entrance matwell
- New wall construction
- New rendering and plastering
- New ceilings and floor screeds
- New sanitaryware
- New fixtures and fittings
- New doorsets including signage and ironmongery
- New window openings
- New anti-pigeon measures
- New raised access floors
- Formation of new ducts and manholes
- Various penetrations / core holes
- Cleaning of various floor and wall areas
- Painting new platform edges including lettering
- Re-staining & re-varnishing woodwork
- Painting walls, ceilings and metalwork
- Brickwork and concrete repairs
- Removal of existing and painting of new anti-graffiti coatings
- Glazing repairs
- Roof repairs
- Replacement and painting of soffit areas