Project: Redbridge Station – Fluor Connect Enabling Works
Client: Fluor Limited
Value: Overall Project £13 Million
New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s
Removal of existing HVAC and replacing with new system.
- Installing new containment for pipework.
- Running electrics and connecting into isolator powered by existing distribution board.
- All testing and commissioning carried out.