Project: Hanger Lane Station – Fluor Connect Enabling Works

Client: Fluor Limited

Value: Overall Project £13 Million

 
Project: Fluor Connect Enabling Works – New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases. The areas when these were installed were cleared of vegetation etc. and excavated. Type 2 was compacted and reinforcement cages installed incorporating earthing rods. C40 strength concrete was place in purpose made formwork.

Rooms within station environment was upgraded and refurbished to house new equipment.. Climate control systems were installed to various CER’s

Installation of new tray work for HVAC pipework using manufactured bends and sets were installed tested and commissioned for use.

 

 