Project: High Barnet Sidings – Walkways
Client: Tube Lines Limited
Works Value: £76,000
Under our Minor and Intermediate works framework for Tube Lines there was a requirement at this location for existing drivers’ walkways between various sidings to be extended and new hardstand areas constructed.
There were also various walkways removed and the areas re-surfaced, and new stop diamonds fixed to the sleepers in the 4-foot of various sidings.