Holborn Station: – Tiling Repairs

Project: Holborn Station – Tiling Repairs

Client: LUL

Works Value: £23,000

 

Station hoardings were installed to the existing tiled flooring on the upper and lower concourses on Escalators 1-3 as part of the escalator repair works.

Where the floor tiles were damaged due to the hoarding we had to replace various damaged tiles to both upper and lower concourses to the closest available colour match which will quickly blend with the existing surrounding tiling due to the amount of daily foot traffic in these areas.  The tile replacement took longer than anticipated as the existing floor tiles were installed on top of even older terrazzo tiles, so two layers had to be broken out along with the damaged screed bed.

 