Jubilee Line Extension: – New Ticket Office

Project: Jubliee Line Extension – New Ticket Office

Client: Lovell Construction Limited

Works Value: £2.5 Million

 
The Jubilee Line Extension required new Ticket Offices to be installed at all stations from Westminster through to Stratford this was a design and build project working from the original JLE concept drawing.

The ticket offices were taken through all stages of design by D&D Rail Ltd with all materials requiring test inspection and final approvals, this included the manufacture and testing of all new ballistic resisting glazing and facing panels of the ticket office front screens. There was a requirement for a full interface of electrical, communication equipment, and induction loops etc. for these screens.

D&D Rail Ltd were involved in this project from conception through to final delivery of the new ticket office suites.

Touch to Call!