Project: Theydon Bois Station – Connect BCV – Various Enabling Packages on Theydon Bois Station, Leytonstone Station and White City Depot
Client: Birse Metro Limited – On Behalf of Metronet BCV
Works Value: Overall £5.4 Million
- Replacement of platform surface (two platforms) including re alignment of platform nosings.
- Complete strip and redecorate of trackside painted surface including hacking off and re-rendering substantial areas.
- Re-configuration of trackside tile band.Tiling on platforms and other public areas.
- Renewal of suspended ceiling in booking hall.
- Replacement of staircase granolithic treads.
- Renewal of fire doors.
- Miscellaneous building works