West Kensington Station: – New Foundations

Project: West Kensington Station – New Foundations

Client: Clancy Docwra

Works Value: £23,000

As part of the task to provide Signal & Track Staff new accommodation, 36No new foundations were to be formed to accommodate modular units.

Works included excavating trial holes for ground investigation / levelling waste ground / removal of redundant concrete pads / set out positioning of new foundations / machine excavation / form shutting / line and level shuttering into position / pump ready mix concrete to excavations / vibrate concrete, trowel off and cover foundations until set / strike shuttering and re-grade area to a finish.

 