Bond Street Station: – ISOR Steelwork and Premises Package

Project: Bond Street Station – ISOR Steelwork and Premises Package Client: Tube Lines Limited – SWIP Team Works Value: £400,000 The existing SOR (Station Operations Room) was due to be refurbished so the staff operating the Station needed to be temporarily housed during this time.  Our task was to build an ISOR (Interim Station Operations Room) […]

Touch to Call!