Boston Manor Station: – Walkways
Project: Boston Manor – Walkways Client: Tube Lines Limited Works Value: £29,000 This work consisted of modifications to the existing fence to incorporate a new access gate with S1 lock, construction of a new walkway for access purposes which was to be left in-situ once works had been completed, construction of a cable stile over […]
Various Stations: – Installation of New Fall Protection System
Project: Various Stations – Installation of New Fall Protection System Client: Tube Lines Limited Works Value: £219,000 This project was for removal of the existing Kee Klamp edge protection and installation of a new Fall Protection System at Alperton, Boston Manor, Bounds Green, Burnt Oak, Chalk Farm, Colliers Wood, South Wimbledon & South Harrow […]
Boston Manor Station: – Installation of New SDP Base
Project: Boston Manor Station – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot Client: Tube Lines Limited Works Value: Overall £4 Million New trackside cable containment, new trackside equipment bases and formation/upgrade of new rooms within station environments. Please see below for selection works. Works at Boston Manor […]