Leigh Heath Court: – FIRAS Works
Project: Leigh Heath Court – FIRAS Works Client: Rylands Associates Works Value: £45,000 The scope of the works was to carry out internal decoration, overhaul and refurbishment of the communal areas of the building. This work included the removal and reconfiguration of the service riser cupboards and redundant lift shafts to avoid unauthorised access, improve […]
Watford South Junction: – FIRAS Works
Project: Watford South Junction – FIRAS Works Client: Orion Engineering Works Value: £5,000 Two new rooms have been formed at Watford South Junction (SER & ESR). Our client employed the services of DDR to maintain a minimum one hour fire compartment within these rooms where penetrative works to the building fabric had been carried out […]
Step Free Access: – Making the Tube Accessible for All
Project: Step Free Access – Step Free Access (31no. Locations) Client: LUL – SWIP Works Value: £150,000 As Transport for London (TfL) announced that nine out of ten buses are now accessible, London Underground (LU) also announced it is investing more than ever before to make the Tube as accessible as possible, as quickly as […]
GRP Ballast Board: Installation to Bridges at Berkshire, Wiltshire and Birmingham
Project: Installation of GRP ballast Board to Bridges at Berkshire, Wiltshire and Birmingham Client: Osborne (for Network Rail) Works Value: £90,000 The sites had to be set up in mostly in remote locations and power had to run to these worksites with task lighting provided for large areas for night time possession working. Welfare […]
Benfleet Station: – Steelwork Painting (ICATS)
Project: Benfleet Station – Cleaning Structural Support Steelwork Client: EWG Works Value: £3,000 The works included cleaning and rubbing down the surface of the existing Structural Support Steelwork and application of a 2 part weatherproof painting system (EPIGRIP C402V2 Primer Coat & RESISTEX C137V2 Finish Coat) to ensure the integrity of the support steel steelwork is protected […]
RVAR Surveys – Various Locations
Project: RVAR Surveys – Various Locations Client: London Underground Works Value: £300,000 D&D Rail have carried out a large number of surveys for the RVAR project for London Underground. These surveys were carried out to assess the feasibility of raising an area of the platform to the level of the train carriage. Our surveys were […]
C01: – Civils Package Works
Project: C01 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s. Enabling works for the CO1 ring. This work includes […]
M032, M034 & M036: – Fluor Connect Enabling Works
Project: MO32, MO34 & MO36 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable post installation for new trackside cabling […]