C01: – Civils Package Works
Project: C01 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s. Enabling works for the CO1 ring. This work includes […]
Holborn Station: – CMS installation
Project: Holborn Station – Fluor Connect Enabling Works Client: Flour Limited Value: Overall Project £13 Million New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable containment installation within existing vent shaft as […]
M032, M034 & M036: – Fluor Connect Enabling Works
Project: MO32, MO34 & MO36 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable post installation for new trackside cabling […]
Redbridge Station: – Removal of Existing HVAC & Replacing with New System
Project: Redbridge Station – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Removal of existing HVAC and replacing with new system. Installing […]
Aldgate Station: – Facilities Package
Project: Aldgate Station – Facilities Package Client: London Underground Limited – Nominee SSL Works Value: £325,000 Take tenancy within offices located next to Station property. Use space to partition and create individual areas for each contractor including a meeting room and welfare area. Provide a portacabin for client office set up. Installation of telephone […]
Archway Station: – Construction of new signalling equipment room
Project: Archway Station – Construction of New Signalling Equipment Room Client: Tube Lines Limited Works Value: £280,000 Construction of a new SER in a vent shaft at Archway Station. The new SER was to be built 2 metres above the existing CER, supported on a steel framework fixed to the tunnel ring/shaft bolts. The new […]
Moorgate Station: – Construction of New SER Room
Project: Moorgate Station – Construction of New SER Room Client: Tube Lines Limited Works Value: £113,000 Construction of a new SER room within an existing lift shaft at Moorgate Station. The new SER was to be built 3 metres up the shaft, supported on a steel superstructure. Our works on this project commenced as […]