C01: – Civils Package Works

Project: C01 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s. Enabling works for the CO1 ring. This work includes […]

Holborn Station: – CMS installation

Project: Holborn Station – Fluor Connect Enabling Works Client: Flour Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable containment installation within existing vent shaft as […]

M032, M034 & M036: – Fluor Connect Enabling Works

Project: MO32, MO34 & MO36 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable post installation for new trackside cabling […]

Redbridge Station: – Removal of Existing HVAC & Replacing with New System

Project: Redbridge Station – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Removal of existing HVAC and replacing with new system. Installing […]

Aldgate Station: – Facilities Package

Project: Aldgate Station – Facilities Package Client: London Underground Limited – Nominee SSL Works Value: £325,000   Take tenancy within offices located next to Station property.  Use space to partition and create individual areas for each contractor including a meeting room and welfare area. Provide a portacabin for client office set up. Installation of telephone […]

Archway Station: – Construction of new signalling equipment room

Project: Archway Station – Construction of New Signalling Equipment Room Client: Tube Lines Limited Works Value: £280,000   Construction of a new SER in a vent shaft at Archway Station. The new SER was to be built 2 metres above the existing CER, supported on a steel framework fixed to the tunnel ring/shaft bolts. The new […]

Moorgate Station: – Construction of New SER Room

Project: Moorgate Station – Construction of New SER Room Client: Tube Lines Limited Works Value: £113,000   Construction of a new SER room within an existing lift shaft at Moorgate Station.  The new SER was to be built 3 metres up the shaft, supported on a steel superstructure. Our works on this project commenced as […]

Touch to Call!