RVAR Surveys – Various Locations

Project: RVAR Surveys – Various Locations Client: London Underground Works Value: £300,000   D&D Rail have carried out a large number of surveys for the RVAR project for London Underground. These surveys were carried out to assess the feasibility of raising an area of the platform to the level of the train carriage. Our surveys were […]

Hanger Lane Station: – CMS works

Project: Hanger Lane Station – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   Project: Fluor Connect Enabling Works – New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases. The areas when these were installed were cleared of vegetation etc. and excavated. Type […]

C01: – Civils Package Works

Project: C01 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s. Enabling works for the CO1 ring. This work includes […]

Holborn Station: – CMS installation

Project: Holborn Station – Fluor Connect Enabling Works Client: Flour Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable containment installation within existing vent shaft as […]

M032, M034 & M036: – Fluor Connect Enabling Works

Project: MO32, MO34 & MO36 – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Cable post installation for new trackside cabling […]

Redbridge Station: – Removal of Existing HVAC & Replacing with New System

Project: Redbridge Station – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million   New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases and formation/upgrade of new rooms within station environments. Climate control to various CER’s Removal of existing HVAC and replacing with new system. Installing […]

Aldgate Station: – Facilities Package

Project: Aldgate Station – Facilities Package Client: London Underground Limited – Nominee SSL Works Value: £325,000   Take tenancy within offices located next to Station property.  Use space to partition and create individual areas for each contractor including a meeting room and welfare area. Provide a portacabin for client office set up. Installation of telephone […]

Archway Station: – Construction of new signalling equipment room

Project: Archway Station – Construction of New Signalling Equipment Room Client: Tube Lines Limited Works Value: £280,000   Construction of a new SER in a vent shaft at Archway Station. The new SER was to be built 2 metres above the existing CER, supported on a steel framework fixed to the tunnel ring/shaft bolts. The new […]

Moorgate Station: – Construction of New SER Room

Project: Moorgate Station – Construction of New SER Room Client: Tube Lines Limited Works Value: £113,000   Construction of a new SER room within an existing lift shaft at Moorgate Station.  The new SER was to be built 3 metres up the shaft, supported on a steel superstructure. Our works on this project commenced as […]

Touch to Call!