Finchley Road Station: – Modernisation & Enhancement Project
Project: Finchley Road Station – Modernisation & Enhancement Project Client: Tube Lines Limited Value: £1.8 Million Station modernisation works including strip-out of existing rooms, demolition and formation of new rooms including the new secure suite. This included the following: Demolition and strip out of existing fixtures and fittings Removal of floor finishes Removal and replacement […]
Jubilee Line Extension: – New Ticket Office
Project: Jubliee Line Extension – New Ticket Office Client: Lovell Construction Limited Works Value: £2.5 Million The Jubilee Line Extension required new Ticket Offices to be installed at all stations from Westminster through to Stratford this was a design and build project working from the original JLE concept drawing. The ticket offices were taken through […]
South Ealing Station: – Post Route & SDP Installation
Project: South Ealing Station – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot Client: Tube Lines Limited Value: Overall £4 Million New trackside cable containment, New SDP base and antenna base were constructed. The areas when these were installed were cleared of vegetation etc. and excavated. Type 2 […]
Northfields Depot: – SDP & Troughing Installation
Project: Northfields Depot – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot Client: Tube Lines Limited Value: Overall £4 Million The new SDP base was constructed adjacent to the Depot access road. A new cable riser and draw pit were incorporated in the pour along with existing cable […]
Boston Manor Station: – Installation of New SDP Base
Project: Boston Manor Station – Tube Lines Connect Enabling Works at South Ealing Station, Boston Manor Station & Northfields Depot Client: Tube Lines Limited Works Value: Overall £4 Million New trackside cable containment, new trackside equipment bases and formation/upgrade of new rooms within station environments. Please see below for selection works. Works at Boston Manor […]
Earl’s Court Station: – Modernisation
Project: Earl’s Court Station – Modernisation Client: Metronet SSL Works Value: £4.1 Million Major building works in association with the modernisation of Earls Court Station including but not exclusively: The demolition of existing South side accommodation and the reconstruction of new ticket offices and service accommodation including the provision of new concrete slabs over the […]
Theydon Bois Station: – Replacement of 2 Platform Surfaces
Project: Theydon Bois Station – Connect BCV – Various Enabling Packages on Theydon Bois Station, Leytonstone Station and White City Depot Client: Birse Metro Limited – On Behalf of Metronet BCV Works Value: Overall £5.4 Million Replacement of platform surface (two platforms) including re alignment of platform nosings. Complete strip and redecorate of trackside […]
White City Depot: – Constucting Reinforced Concrete Slabs
Project: White City Depot – Connect BCV – Various Enabling Packages on Theydon Bois Station, Leytonstone Station and White City Depot Client: Birse Metro Limited – On Behalf of Metronet BCV Works Value: Overall £5.4 Million We have worked at two locations within the Depot constructing reinforced concrete slabs. The work involved over site […]
Leytonstone Station: – Connect BCV
Project: Leytonstone Station – Connect BCV – Various Enabling Packages on Theydon Bois Station, Leytonstone Station and White City Depot Client: Birse Metro Limited – On Behalf of Metronet BCV Works Value: Overall £5.4 Million Within a very restricted site bordered by service cables and with the requirement to maintain access through the site […]
Bank Station: – Escalator 8, 9, 10 & 11 – Civils and Cable Protection
Project: Bank Station – Escalator 8, 9, 10 & 11 Civils and Cable Protection Client: London Underground Limited – Nominee BCV Limited Works Value: £500,000 Under the auspices of the LULN, L&E Framework D & D Rail Ltd were awarded a contract to carry out the Civils Enabling works for the replacement of Escalators 8 9 […]
Earl’s Court Station: – Lifts 3 & 4 – Civils Work
Project: Earl’s Court Station – Lifts 3 & 4 – Civils Work Client: London Underground Limited – Capital Programmes Directorate Works Value: £58,000 The existing steelwork within the Counterweight Shaft required refurbishment as contained surface corrosion. The Counterweight Shaft is designated as a confined space. Using trained staff and working in accordance with a […]
Green Park Station: – Reinstallation of VE Panels
Project: Green Park Station – Reinstallation of VE Panels Client: Tube Lines Limited Works Value: £65,000 D & D Rail Ltd where recently instructed to reinstall 344 No VE Panels at Green Park Station. These VE Panels had been removed during station modernisation works carried out on the Victoria Line platforms and Lower Concourse by […]
Stratford Station: – Signage & Handrail Installation
Project: Stratford Station – Signage & Handrail Installation Client: Tube Lines Limited Works Value: £120,000 As part of the station upgrade and improvement works in relation to Westfield and Olympic Village construction, new signage was required to be installed to direct the public from the Southern Concourse on the East Side, West Side and […]
RVAR Surveys – Various Locations
Project: RVAR Surveys – Various Locations Client: London Underground Works Value: £300,000 D&D Rail have carried out a large number of surveys for the RVAR project for London Underground. These surveys were carried out to assess the feasibility of raising an area of the platform to the level of the train carriage. Our surveys were […]
Hanger Lane Station: – CMS works
Project: Hanger Lane Station – Fluor Connect Enabling Works Client: Fluor Limited Value: Overall Project £13 Million Project: Fluor Connect Enabling Works – New trackside cable containment, together with installation of 75 kilometres of new cable, new trackside equipment bases. The areas when these were installed were cleared of vegetation etc. and excavated. Type […]