Euston Station: – Airwave Dual Cab Sites Enabling (Civils)

Project: Euston Station – Airwave Dual Cab Sites Enabling (Civils) Client: Tube Lines Limited Works Value: £25,000   This work package was for the Civils Works as part of the Airwave Dual Cab Sites Enabling Project.  The works were to provide support for the relocation of existing power cabinets and installation of new power cabinets at […]

Heathrow T123 Station: – SMEP Firestopping

Project: Heathrow T123 Station – SMEP Firestopping Client: Tube Lines Limited Works Value: £55,000   As a FIRAS approved contractor, we were instructed to carry out the permanent fire stopping and fire compartmentation for the Heathrow T123 SMEP Project.  During the course of the SMEP project at this station several contractors were tasked with making […]

Morden Station: – New Stepping Back Office (Premises, Civils, Electrical and Fire)

Project: Morden Station- New Stepping Back Office (Premises, Civils, Electrical and Fire) Client: Tube Lines Limited Works Value: £125,000   We were awarded a work package for the formation of a new Stepping Back Office at Morden Station.  This work package included Premises, Civils, Electrical and Fire scopes.  The existing DMT’s Office was to have a […]

Stratford Market Depot: – Premises Works

Project: Stratford Market Depot – Premises Works Client: Tube Lines Limited Works Value: £90,000   D&D Rail Ltd have carried out several projects at Stratford Market Depot for TLL under the Minor Works Contract.  These projects were carried out on behalf of the security team to improve Access Control. The following tasks were undertaken as […]

Night Tube: – Enabling Works – Collapsible Gate Project

Project: Night Tube – Enabling Works – Collapsible Gate Project Client: Tube Lines Limited Works Value: £60,000   We were required to manufacture and install bespoke portal frames for housing collapsible gates to aid station staff once the Night Tube went live at Canning Town, Liverpool Street, London Bridge & Piccadilly Circus Stations.  The frames were […]

Ruislip Depot: – Pit Road Drainage

Project: Ruislip Depot – Pit Road Drainage Client: Tube Lines Limited Works Value: £5,000   We were requested to attend a site meeting at Ruislip Depot to help solve a problem with the drainage of 2 No. Pit Roads.  The Depot ends of the Pit Roads had been bunded to retain contaminated water produced during […]

Greenford Station: – Phase I – Civil works in conjunction with installation of Escalator 1

Project: Greenford Station – Phase I – Civil Works in Conjunction with Installation of Escalator 1 Client: London Underground Limited – L&E Team Works Value: £230,000   Our task was to carry out the civil works in conjunction with new install of Escalator 1 at Greenford Station.  These works involved the following: Temporary cable protection was […]

Bond Street Station: – ISOR Steelwork and Premises Package

Project: Bond Street Station – ISOR Steelwork and Premises Package Client: Tube Lines Limited – SWIP Team Works Value: £400,000 The existing SOR (Station Operations Room) was due to be refurbished so the staff operating the Station needed to be temporarily housed during this time.  Our task was to build an ISOR (Interim Station Operations Room) […]

Northfields Depot: – Refurbishment of the Duty Depot Manager’s Office & Construction of a new Mezzanine Area

Project: Northfields Depot – Refurbishment of the Duty Depot Managers Office & Construction of a New Mezzanine Area Client: Tube Lines Limited Works Value: £425,000   Our works for Northfields Depot were completed as part of our Minor and Intermediate Framework with Tube Lines.  This project was for the refurbishment of the Duty Depot Manager’s […]

Greenford Station: – Phase II & III – L&E Civils Works

Project: Greenford Station – Phase II & III – Civil Works in Conjunction with Installation of New Inclined Lift and the Replacement of Existing Central Staircase Client: London Underground Limited – L&E Team Works Value: £1.4 Million As part of the installation of new Inclined Lift & Central Staircase at Greenford Station, our task was to […]

Hammersmith Service Control Centre: – Premises Works

Project: Hammersmith Service Control Centre – Premises Works Client: TfL Four Lines Modernisation Works Value: £30,000   Our scope of works included the provision of premises works including floor finishes and penetrations to install new floor vents and service grommets. Survey Of Existing Room Condition Prior to commencing any works D&D Rail had to undertake […]

Edgware Station: – Walkway

Project: Edgware Station – Walkway Client: Tube Lines Limited Works Value: £78,000   Our scope of works included the provision of a new walkway, door and associated lighting at Edgware Station between the train shed and the north end of platform 3 to allow train drivers more convenient and safer access to and from trains stabled […]

Kennington Station: – Replacement of Defective Delta Lining

Project: Kennington Station – Replacement of Defective Delta Lining Client: Tube Lines Limited Works Value: £170,000   We were tasked with the replacement of defective DELTA Lining on the Platform 4 walls.  Works at high level were carried out off of mobile towers erected either onto the track bed or off of pit platforms. The […]

Various Stations: – Installation of New Fall Protection System

Project: Various Stations – Installation of New Fall Protection System Client: Tube Lines Limited Works Value: £219,000   This project was for removal of the existing Kee Klamp edge protection and installation of a new Fall Protection System at Alperton, Boston Manor, Bounds Green, Burnt Oak, Chalk Farm, Colliers Wood, South Wimbledon & South Harrow […]

Kings Cross Station: – Escalators 1, 2, 3 Civil & Premises Works

Project: Kings Cross Station – Escalators 1, 2, 3 Civil & Premises Works Client: London Underground Limited – L&E Team Works Value: £428,000   As part of the of Escalators 1-3 replacement works at King’s Cross Station our task was to carry out the Civil & Premises works in conjunction with new install.  Works included the […]

Touch to Call!