East Putney, Parsons Green & Wimbledon Park Stations: – Platform Works
Project: East Putney, Parsons Green & Wimbledon Park Stations – Platform Works Client: IPS Works Value: £100,000 Works consisted of excavation on the platforms and formation of new reinforced concrete lighting column bases complete with reinstatement of platform surfaces. New duct routes were also excavated and installed on the platforms for new services to […]
Bollo House: – Civils-Electrical-Fire Disciplines for Lift Replacement
Project: Bollo House – Civils, Electrical & Fire Disciplines for Lift Replacement Client: Tube Lines Limited Works Value: £40,000 The existing lift at Bollo House was built circa 1996. To enable this to meet DDA requirements, a new wider lift needed to be installed. Our task was to create wider and re-configured entrances at three levels […]
Bank Station: – Escalator 6 & 7 Cable Protection Premises & Civils Work
Project: Bank Station – Escalator 6 & 7 Cable Protection, Premises & Civils Work Client: London Underground Limited Works Value: £150,000 D&D Rail Ltd were contracted for the Cable Protection, Premises & Civils works associated with the replacement of Escalators 6 & 7 at Bank Station. Prior to the removal of the existing we were instructed […]
GRP Ballast Board: Installation to Bridges at Berkshire, Wiltshire and Birmingham
Project: Installation of GRP ballast Board to Bridges at Berkshire, Wiltshire and Birmingham Client: Osborne (for Network Rail) Works Value: £90,000 The sites had to be set up in mostly in remote locations and power had to run to these worksites with task lighting provided for large areas for night time possession working. Welfare […]
Highgate Service Control Centre: – Replacement of Vehicle Road Blocker
Project: Highgate Service Control Centre – Replacement of Vehicle Road Blocker Client: Tube Lines Limited Works Value: £25,000 The Vehicle Blocker on the access road to the Service Control Centre at Highgate was to be replaced due to safety concerns. D&D Rail were contracted to carry out the civils work associated with this activity. Works […]
Paddington Station: – Enabling Works – Streetworks
Project: Paddington Station – Enabling Works – Streetworks Client: UK Power Network Works Value: £12,000 We were awarded a contract for enabling works at Paddington Station. This work was related to the replacement of the existing DC supply escalators with new HD Metro type, supplied from a new AC intake to be installed by […]
Angel Station: – Welfare Facilities
Project: Angel Station – Welfare Facilities Client: London Underground Limited Works Value: £22,000 Our task was to provide the LUL L&E Projects Team with a welfare area constructed from a partition consisting of British Gypsum components which needed to maintain a one hour fire rated compartment during the project lifecycle. A Lobby, Welfare and Locker Room […]
Ruislip Depot: – Vehicle Load Gauges
Project: Ruislip Depot – Vehicle Load Gauges Client: Tube Lines Limited Works Value: £22,000 As part of our framework for Minor & intermediate Works we were asked to supply and install 2 No Vehicle Load Gauges over roads at Ruislip Depot. The gauges were to be installed on non-electrified track in areas of the depot […]
Bounds Green, Kentish Town & Old Street Stations: – Provision of Welfare Facilities
Project: Bounds Green, Kentish Town & Old Street Stations – Provision of Welfare Facilities Client: Tube Lines Limited Works Value: £170,000 D&D Rail Ltd were given an order to supply welfare facilities for the Tube Lines L&E Team whilst they were carrying out the refurbishment of escalators at Bounds Green, Kentish Town & Old Street […]
Westminster Station: – Replacement of Tactiles On Platforms 1 & 2
Project: Westminster Station – Replacement of Tactiles On Platforms 1 & 2 Client: Tube Lines Limited Works Value: £80,000 As part of our framework for Minor & intermediate Works we were asked to replace undersized concrete tactiles on platforms 1 & 2 of Westminster Station with full sized concrete tactiles. Our works commenced with the […]
Mornington Crescent Station: – Platforms 1&2 Hoarding Installation
Project: Mornington Crescent – Platforms 1 & 2 Hoarding Installation Client: Tube Lines Limited Works Value: £22,000 To support the re-rail and sleeper rehabilitation programme, our task was to install storage hoardings for the project. These were located at the tail wall end of Platform 1 (Northbound) and at the head wall end of Platform […]
Cockfosters Depot: – New Security Gate House Project – Civil Works
Project: Cockfosters Depot – New Security Gate House Project Client: Tube Lines Limited Works Value: £40,000 This work package is for the Enabling Works for the installation of a new Security Cabin at the Entrance to Cockfosters Depot. Our scope was for the construction of a concrete base to support the new cabin, the formation […]
Euston Station: – Airwave Dual Cab Sites Enabling (Civils)
Project: Euston Station – Airwave Dual Cab Sites Enabling (Civils) Client: Tube Lines Limited Works Value: £25,000 This work package was for the Civils Works as part of the Airwave Dual Cab Sites Enabling Project. The works were to provide support for the relocation of existing power cabinets and installation of new power cabinets at […]
Heathrow T123 Station: – SMEP Firestopping
Project: Heathrow T123 Station – SMEP Firestopping Client: Tube Lines Limited Works Value: £55,000 As a FIRAS approved contractor, we were instructed to carry out the permanent fire stopping and fire compartmentation for the Heathrow T123 SMEP Project. During the course of the SMEP project at this station several contractors were tasked with making […]